sruthir28/decision-memo-builder
Builds a 1-page decision memo (context → options → recommendation → risks → ask) enforcing McKinsey memo DNA — brutal brevity, SCP storyline clarity, decision-forcing output, evidence density. Use when drafting a memo for a leadership decision, a scope cut, a buy/build/partner call, a roadmap slip, or any "should we X?" moment that needs a yes/no from a specific person by a specific date.
npx skills add https://github.com/sruthir28/enterprise-ai-skills --skill decision-memo-builder
A 1-page memo that forces a decision. Not a status update. Not a brief. Not a FYI. The reader walks away knowing exactly what they are being asked to approve, by when, and why.
Every decision memo must pass all four. If the draft fails one, rewrite. Do not ship a memo that fails Memo DNA.
Name the decision, not the topic.
State of the world *before* the ask. Facts only. Baseline numbers. No history-of-the-universe framing.
What changed, or what's at risk if we don't decide now. Include the number that makes this urgent.
Mutually exclusive. Each option gets:
Do not sneak a recommendation in here.
State the chosen option and why it wins on the decision criteria that matter most. Cite the evidence that tips the call.
The top 3 things that could go wrong, each paired with a 1-line mitigation. Not a risk inventory — the three the reader would actually ask about.
A specific yes/no request with an owner and a date.
Title
Switch engineering + product from Jira to Linear by 5/30
Context
~60 engineers and PMs on Jira today. $48K/yr in licenses. 4 active projects, custom workflows, 6 years of history. Engineering NPS on tooling = 4/10 in the Q1 survey.
Complication
Jira admin role has been open 4 months; no single owner maintaining workflows. Two teams (Growth, Platform) ran Linear pilots in Q1 — 30% faster issue creation, 50% less "which field is required" confusion. Renewal is due 5/30 and auto-renews at +12%.
Options
Recommendation
Migrate to Linear. Saves $18K/yr, ends the 4-month admin vacancy, and two pilot teams already validate the productivity win (60 people × 1 hr/wk saved ≈ $300K/yr loaded). The "lost reports" risk is low — exec dashboards already live in Looker, not Jira.
Risks & Mitigations
The Ask
Approve Linear migration by 5/30. Priya owns migration plan; Alex cancels Jira renewal.
Title
Cut AI-tagging from v2 launch — approve by EOD
Context
v2 is committed for 5/15. Current scope: 8 features, ~1,800 engineer-hours estimated. Team capacity = 1,400 hours remaining.
Complication
We're 400 hours over. AI-tagging alone = 350 hours and blocks 3 other teams' integrations if it slips.
Options
Recommendation
Cut AI-tagging. Launch date > this feature. AI-tagging ranked #6 in customer survey (n=42). Cutting the 2 smaller features would break a conversion funnel we validated last quarter (+18% activation).
Risks & Mitigations
The Ask
Approve cutting AI-tagging from v2 by EOD. Alex updates GTM narrative; Jordan re-plans v2.1.
issue-tree-builderscpr-frameworkstoryline-buildermckinsey-criticTake sruthir28/decision-memo-builder from the repository into ~/.claude/skills for personal
use, or into .claude/skills inside a project.
The agent identifies a skill by the name field in its header. Two skills with the
same name cannot sit side by side — one of them will be ignored.