Day 4 (Thursday) move of a Design Sprint that produces the planning artifact for the day. Output covers the prototype role plan (Maker, Stitcher, Writer, Asset Collector, Interviewer), prototype brief (what to build, fidelity bar, time allocation per role), canonical Five-Act Interview script (Welcome, Context, Intro, Tasks, Debrief), trial-run checklist, and Friday participant confirmation tracker. The actual prototype build is craft work outside the skill's AI invocation surface. Use Thursday morning after Wednesday's storyboard is signed off.
npx skills add https://github.com/product-on-purpose/pm-skills --skill tool-design-sprint-prototype-plan
<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->
Thursday is the prototype build day. This skill produces the morning planning artifact that makes the build run; it does NOT build the prototype itself. The skill assigns roles, locks the fidelity bar, drafts the Five-Act interview script, defines the trial-run gate, and confirms Friday participants. The actual building (Figma frames, slideware decks, role-play scripts, paper assemblies) is craft work the team owns through the rest of Thursday.
Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills.
tool-design-sprint-decide-and-storyboard; without a locked storyboard, the prototype has no spec.A single bundled artifact with five sections:
See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog Thursday morning artifact.
Sprint book Chapter 16 defines these 5 roles. The skill assigns them; the humans fill them.
| Role | What they do | Typical owner |
|---|---|---|
| Maker | Builds the prototype surface (Figma frames, Keynote slides, role-play props). Owns visual and interaction work. | Design lead |
| Stitcher | Connects the Maker's surfaces into a coherent end-to-end flow (Figma interactions, Keynote transitions, role-play sequence). | Design lead OR engineering lead |
| Writer | Writes prototype copy (button labels, body text, error states, microcopy). Critical for credibility; bad copy breaks trust. | PM OR researcher |
| Asset Collector | Sources images, icons, sample data (book covers, names, dates, fake-but-believable data). | Anyone with free hands; often whoever isn't on the critical path. |
| Interviewer | Runs Friday's interviews. Spends Thursday afternoon drafting and mock-running the Five-Act script. | Researcher OR PM with interview experience. |
On a 4-person team, Maker and Stitcher typically merge (one design owner); Writer and Asset Collector can merge; Interviewer is always a dedicated role.
Canonical structure from Sprint book Chapter 17. The act sequence is fixed; the Tasks act is heavily customized; the other acts are mostly canonical wording.
| Act | Time | Purpose | Canonicality |
|---|---|---|---|
| Welcome | 5 min | Friendly intro; consent confirmation; explain not testing the customer | Canonical wording with team-name swap |
| Context | 5-10 min | Learn the customer's current behavior and context related to the challenge | Canonical questions; team adapts to challenge |
| Intro | 5 min | Introduce the prototype; explain it's a prototype (some things won't work) and ask the customer to think aloud | Canonical wording |
| Tasks | 20-30 min | Customer attempts the storyboard tasks; interviewer observes and probes; team observes silently from breakout room | Team-supplied wording derived from storyboard |
| Debrief | 5-10 min | Open-ended reactions; pricing questions if relevant; thank-you | Canonical structure; team adapts pricing question |
Prerequisites: tool-design-sprint-decide-and-storyboard. Prototype-plan consumes Wednesday's storyboard as the build spec. Without a storyboard, this skill has no panels to map roles against.
This skill does NOT invoke tool-note-and-vote. Thursday morning planning has no voting moment; the role plan and script decisions are Facilitator-led with Decider sign-off.
Next invocation in the sprint: tool-design-sprint-test-and-score Friday morning.
This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider approves the role plan, the fidelity bar in the prototype brief, the interview script's Tasks act, and the trial-run gate criteria. Once signed, the team disperses into parallel build work; the Decider returns Friday PM for the post-interview Decider review.
Guide users through a structured workflow for co-authoring documentation. Use when user wants to write documentation, proposals, technical specs, decision docs, or similar structured content. This workflow helps users efficiently transfer context, refine content through iteration, and verify the doc works for readers. Trigger when user mentions writing docs, creating proposals, drafting specs, or similar documentation tasks.
Intelligently organizes your files and folders across your computer by understanding context, finding duplicates, suggesting better structures, and automating cleanup tasks. Reduces cognitive load and keeps your digital workspace tidy without manual effort.
Generates creative domain name ideas for your project and checks availability across multiple TLDs (.com, .io, .dev, .ai, etc.). Saves hours of brainstorming and manual checking.
You MUST use this before any creative work - creating features, building components, adding functionality, or modifying behavior. Explores user intent, requirements and design before implementation.
Implements Manus-style file-based planning for complex tasks. Creates task_plan.md, findings.md, and progress.md. Use when starting complex multi-step tasks, research projects, or any task requiring >5 tool calls.
Creative research ideation and exploration. Use for open-ended brainstorming sessions, exploring interdisciplinary connections, challenging assumptions, or identifying research gaps. Best for early-stage research planning when you do not have specific observations yet. For formulating testable hypotheses from data use hypothesis-generation.
Comprehensive GitHub project management with swarm-coordinated issue tracking, project board automation, and sprint planning
Interview the user relentlessly about a plan or design until reaching shared understanding, resolving each branch of the decision tree. Use when user wants to stress-test a plan, get grilled on their design, or mentions "grill me".
Take product-on-purpose/tool-design-sprint-prototype-plan from the repository into ~/.claude/skills for personal
use, or into .claude/skills inside a project.
The agent identifies a skill by the name field in its header. Two skills with the
same name cannot sit side by side — one of them will be ignored.