mcpbeat Sign in

Generate Status Report Skill for Codex

Generate project status reports from Jira issues and publish to Confluence. When an agent needs to: (1) Create a status report for a project, (2) Summarize project progress or updates, (3) Generate weekly/daily reports from Jira, (4) Publish status summaries to Confluence, or (5) Analyze project blockers and completion. Queries Jira issues, categorizes by status/priority, and creates formatted reports for delivery managers and executives.

6k tokens
context cost
the whole folder, loaded on every use
5
files
ships runnable scripts
1
copies elsewhere
how many repositories repackaged it
4915
stars on the repo
on the repository, not the skill itself

Install

one command, takes just this skill from the repository
npx skills add https://github.com/openai/plugins --skill generate-status-report

What comes with it

11 047 bytes besides the instruction
agents/openai.yaml
references/jql-patterns.md
references/report-templates.md
scripts/jql_builder.py

The instruction itself

22 sections, as written by the author

Generate Status Report

Keywords

status report, project status, weekly update, daily standup, Jira report, project summary, blockers, progress update, Confluence report, sprint report, project update, publish to Confluence, write to Confluence, post report

Automatically query Jira for project status, analyze issues, and generate formatted status reports published to Confluence.

CRITICAL: This skill should be interactive. Always clarify scope (time period, audience, Confluence destination) with the user before or after generating the report. Do not silently skip Confluence publishing—always offer it.

Workflow

Generating a status report follows these steps:

  • Identify scope - Determine project, time period, and target audience
  • Query Jira - Fetch relevant issues using JQL queries
  • Analyze data - Categorize issues and identify key insights
  • Format report - Structure content based on audience and purpose
  • Publish to Confluence - Create or update a page with the report

Step 1: Identify Scope

IMPORTANT: If the user's request is missing key information, ASK before proceeding with queries. Do not assume defaults without confirmation for Confluence publishing.

Clarify these details:

Project identification:

  • Which Jira project key? (e.g., "PROJ", "ENG", "MKTG")
  • If the user mentions a project by name but not key, search Jira to find the project key

Time period:

  • If not specified, ask: "What time period should this report cover? (default: last 7 days)"
  • Options: Weekly (7 days), Daily (24 hours), Sprint-based (2 weeks), Custom period

Target audience:

  • If not specified, ask: "Who is this report for? (Executives/Delivery Managers, Team-level, or Daily standup)"
  • Executives/Delivery Managers: High-level summary with key metrics and blockers
  • Team-level: Detailed breakdown with issue-by-issue status
  • Daily standup: Brief update on yesterday/today/blockers

Report destination:

  • ALWAYS ASK if not specified: "Would you like me to publish this report to Confluence? If so, which space should I use?"
  • If user says yes: Ask for space name or offer to list available spaces
  • Determine: New page or update existing page?
  • Ask about parent page if creating under a specific section

Step 2: Query Jira

Use the searchJiraIssuesUsingJql tool to fetch issues. Build JQL queries based on report needs.

Common Query Patterns

For comprehensive queries, use the scripts/jql_builder.py utility to programmatically build JQL strings. For quick queries, reference references/jql-patterns.md for examples.

All open issues in project:

project = "PROJECT_KEY" AND status != Done ORDER BY priority DESC, updated DESC

Issues updated in last week:

project = "PROJECT_KEY" AND updated >= -7d ORDER BY priority DESC

High priority and blocked issues:

project = "PROJECT_KEY" AND (priority IN (Highest, High) OR status = Blocked) AND status != Done ORDER BY priority DESC

Completed in reporting period:

project = "PROJECT_KEY" AND status = Done AND resolved >= -7d ORDER BY resolved DESC

Query Strategy

For most reports, execute multiple targeted queries rather than one large query:

  • Completed issues: Get recently resolved tickets
  • In-progress issues: Get active work items
  • Blocked issues: Get blockers requiring attention
  • High priority open: Get critical upcoming work

Use maxResults: 100 for initial queries. If pagination is needed, use nextPageToken from results.

Data to Extract

For each issue, capture:

  • key (e.g., "PROJ-123")
  • summary (issue title)
  • status (current state)
  • priority (importance level)
  • assignee (who's working on it)
  • created / updated / resolved dates
  • description (if needed for context on blockers)

Step 3: Analyze Data

Process the retrieved issues to identify:

Metrics:

  • Total issues by status (Done, In Progress, Blocked, etc.)
  • Completion rate (if historical data available)
  • Number of high priority items
  • Unassigned issue count

Key insights:

  • Major accomplishments (recently completed high-value items)
  • Critical blockers (blocked high priority issues)
  • At-risk items (overdue or stuck in progress)
  • Resource bottlenecks (one assignee with many issues)

Categorization:

Group issues logically:

  • By status (Done, In Progress, Blocked)
  • By priority (Highest → Low)
  • By assignee or team
  • By component or epic (if relevant)

Step 4: Format Report

Select the appropriate template based on audience. Templates are in references/report-templates.md.

For Executives and Delivery Managers

Use Executive Summary Format:

  • Brief overall status (🟢 On Track / 🟡 At Risk / 🔴 Blocked)
  • Key metrics (total, completed, in progress, blocked)
  • Top 3 highlights (major accomplishments)
  • Critical blockers with impact
  • Upcoming priorities

Keep it concise - 1-2 pages maximum. Focus on what matters to decision-makers.

For Team-Level Reports

Use Detailed Technical Format:

  • Completed issues listed with keys
  • In-progress issues with assignee and priority
  • Blocked issues with blocker description and action needed
  • Risks and dependencies
  • Next period priorities

Include more detail - Team needs issue-level visibility.

For Daily Updates

Use Daily Standup Format:

  • What was completed yesterday
  • What's planned for today
  • Current blockers
  • Brief notes

Keep it brief - This is a quick sync, not comprehensive analysis.

Step 5: Publish to Confluence

After generating the report, ALWAYS offer to publish to Confluence (unless user explicitly said not to).

If user hasn't specified Confluence details yet, ask:

  • "Would you like me to publish this report to Confluence?"
  • "Which Confluence space should I use?"
  • "Should this be nested under a specific parent page?"

Use the createConfluencePage tool to publish the report.

Page creation:

createConfluencePage(
    cloudId="[obtained from getConfluenceSpaces or URL]",
    spaceId="[numerical space ID]",
    title="[Project Name] - Status Report - [Date]",
    body="[formatted report in Markdown]",
    contentFormat="markdown",
    parentId="[optional - parent page ID if nesting under another page]"
)

Title format examples:

  • "Project Phoenix - Weekly Status - Dec 3, 2025"
  • "Engineering Sprint 23 - Status Report"
  • "Q4 Initiatives - Status Update - Week 49"

Body formatting:

Write the report content in Markdown. The tool will convert it to Confluence format. Use:

  • Headers (#, ##, ###) for structure
  • Bullet points for lists
  • Bold (text) for emphasis
  • Tables for metrics if needed
  • Links to Jira issues: PROJ-123

Best practices:

  • Include the report date prominently
  • Link directly to relevant Jira issues
  • Use consistent naming conventions for recurring reports
  • Consider creating under a "Status Reports" parent page for organization

Finding the Right Space

If the user doesn't specify a Confluence space:

  • Use getConfluenceSpaces to list available spaces
  • Look for spaces related to the project (matching project name or key)
  • If unsure, ask the user which space to use
  • Default to creating in the most relevant team or project space

Updating Existing Reports

If updating an existing page instead of creating new:

  • Get the current page content:
getConfluencePage(
    cloudId="...",
    pageId="123456",
    contentFormat="markdown"
)
  • Update the page with new content:
updateConfluencePage(
    cloudId="...",
    pageId="123456",
    body="[updated report content]",
    contentFormat="markdown",
    versionMessage="Updated with latest status - Dec 8, 2025"
)

Complete Example Workflow

User request: "Generate a status report for Project Phoenix and publish it to Confluence"

Step 1 - Identify scope:

  • Project: Phoenix (need to find project key)
  • Time period: Last week (default)
  • Audience: Not specified, assume executive level
  • Destination: Confluence, need to find appropriate space

Step 2 - Query Jira:

# Find project key first
searchJiraIssuesUsingJql(
    cloudId="...",
    jql='project = "PHOENIX" OR project = "PHX"',
    maxResults=1
)

# Query completed issues
searchJiraIssuesUsingJql(
    cloudId="...",
    jql='project = "PHX" AND status = Done AND resolved >= -7d',
    maxResults=50
)

# Query blocked issues
searchJiraIssuesUsingJql(
    cloudId="...",
    jql='project = "PHX" AND status = Blocked',
    maxResults=50
)

# Query in-progress high priority
searchJiraIssuesUsingJql(
    cloudId="...",
    jql='project = "PHX" AND status IN ("In Progress", "In Review") AND priority IN (Highest, High)',
    maxResults=50
)

Step 3 - Analyze:

  • 15 issues completed (metrics)
  • 3 critical blockers (key insight)
  • Major accomplishment: API integration completed (highlight)

Step 4 - Format:

Use Executive Summary Format from templates. Create concise report with metrics, highlights, and blockers.

Step 5 - Publish:

# Find appropriate space
getConfluenceSpaces(cloudId="...")

# Create page
createConfluencePage(
    cloudId="...",
    spaceId="12345",
    title="Project Phoenix - Weekly Status - Dec 3, 2025",
    body="[formatted markdown report]",
    contentFormat="markdown"
)

Tips for Quality Reports

Be data-driven:

  • Include specific numbers and metrics
  • Reference issue keys directly
  • Show trends when possible (e.g., "completed 15 vs 12 last week")

Highlight what matters:

  • Lead with the most important information
  • Flag blockers prominently
  • Celebrate significant wins

Make it actionable:

  • For blockers, state what action is needed and from whom
  • For risks, provide mitigation options
  • For priorities, be specific about next steps

Keep it consistent:

  • Use the same format for recurring reports
  • Maintain predictable structure
  • Include comparable metrics week-over-week

Provide context:

  • Link to Jira for details
  • Explain the impact of blockers
  • Connect work to business objectives when possible

Resources

scripts/jql_builder.py

Python utility for programmatically building JQL queries. Use this when you need to construct complex or dynamic queries. Import and use the helper functions rather than manually concatenating JQL strings.

references/jql-patterns.md

Quick reference of common JQL query patterns for status reports. Use this for standard queries or as a starting point for custom queries.

references/report-templates.md

Detailed templates for different report types and audiences. Reference this to select the appropriate format and structure for your report.

Other skills for the same job

different authors, same section of the catalogue
Startup Analyst
by ComeOnOliver
×2

Expert startup business analyst specializing in market sizing, financial modeling, competitive analysis, and strategic planning for early-stage companies. Use PROACTIVELY when the user asks about market opportunity, TAM/SAM/SOM, financial projections, unit economics, competitive landscape, team planning, startup metrics, or business strategy for pre-seed through Series A startups.

5k tokens
Team Composition Analysis
by ComeOnOliver
×2

This skill should be used when the user asks to "plan team structure", "determine hiring needs", "design org chart", "calculate compensation", "plan equity allocation", or requests organizational design and headcount planning for a startup.

5k tokens
Bulk Rnaseq
by K-Dense-AI
×1

End-to-end bulk RNA-seq orchestrator — takes raw FASTQ reads through QC and trimming (FastQC, fastp/Trim Galore), alignment and quantification (STAR, Salmon, featureCounts), assembles a gene-level counts matrix, then hands off to differential expression (pydeseq2), pathway/GSEA enrichment (pathway-enrichment), and publication figures (scientific-visualization). Use whenever the user has bulk RNA-seq reads or quant output and wants a complete, reproducible differential-expression workflow — e.g. "analyze my RNA-seq", "FASTQ to DESeq2", "run nf-core/rnaseq", "STAR/Salmon quantification", "build a counts matrix for DESeq2", or "go from reads to differentially expressed genes and enriched pathways". Routes between an nf-core/rnaseq (Nextflow) path and a standalone STAR/Salmon path, and covers experimental design, strandedness, and QC gates. For single-cell RNA-seq use the scanpy skill instead.

13k tokens scripts
Us Market Bubble Detector
by nicepkg
×1

Evaluates market bubble risk through quantitative data-driven analysis using the revised Minsky/Kindleberger framework v2.1. Prioritizes objective metrics (Put/Call, VIX, margin debt, breadth, IPO data) over subjective impressions. Features strict qualitative adjustment criteria with confirmation bias prevention. Supports practical investment decisions with mandatory data collection and mechanical scoring. Use when user asks about bubble risk, valuation concerns, or profit-taking timing.

22k tokens scripts
Gws Workflow Standup Report
by googleworkspace
vendor

Google Workflow: Today's meetings + open tasks as a standup summary.

278 tokens
Recipe Create Events From Sheet
by googleworkspace
vendor

Read event data from a Google Sheets spreadsheet and create Google Calendar entries for each row.

223 tokens
Baoyu Diagram
by JimLiu

Create professional, dark-themed SVG diagrams of any type — architecture diagrams, flowcharts, sequence diagrams, structural diagrams, mind maps, timelines, illustrative/conceptual diagrams, and more. Use this skill whenever the user asks for any kind of technical or conceptual diagram, visualization of a system, process flow, data flow, component relationship, network topology, decision tree, org chart, state machine, or any visual representation of structure/logic/process. Also trigger when the user says "画个图" "画一个架构图" "diagram" "flowchart" "sequence diagram" "draw me a ..." or uploads content and asks to visualize it. Output is always a standalone .svg file.

7k tokens scripts
Start
by anthropics
vendor

Initialize the productivity system and open the dashboard. Use when setting up the plugin for the first time, bootstrapping working memory from your existing task list, or decoding the shorthand (nicknames, acronyms, project codenames) you use in your todos.

1k tokens

How to use it

Copy the folder

Take openai/generate-status-report from the repository into ~/.claude/skills for personal use, or into .claude/skills inside a project.

Check the name does not clash

The agent identifies a skill by the name field in its header. Two skills with the same name cannot sit side by side — one of them will be ignored.