Guides structured 4-stage experiment execution with attempt budgets and gate conditions: Stage 1 initial implementation (reproduce baseline), Stage 2 hyperparameter tuning, Stage 3 proposed method validation, Stage 4 ablation study. Integrates with evo-memory (load prior strategies, trigger IVE/ESE) and experiment-craft (5-step diagnostic on failure). Use when: user has a planned experiment, needs to reproduce baselines, organize experiment workflow, or systematically validate a method. Do NOT use for debugging a specific experiment failure (use experiment-craft) or designing which experiments to run (use paper-planning).
npx skills add https://github.com/BioTender-max/awesome-bio-agent-skills --skill experiment-pipeline
Creates detailed, sectionized implementation plans through research, stakeholder interviews, and multi-LLM review. Use when planning features that need thorough pre-implementation analysis.
This skill should be used when scientists need help with research problem selection, project ideation, troubleshooting stuck projects, or strategic scientific decisions. Use this skill when users ask to pitch a new research idea, work through a project problem, evaluate project risks, plan research strategy, navigate decision trees, or get help choosing what scientific problem to work on. Typical requests include "I have an idea for a project", "I'm stuck on my research", "help me evaluate this project", "what should I work on", or "I need strategic advice about my research".
Research ideation partner. Generate hypotheses, explore interdisciplinary connections, challenge assumptions, develop methodologies, identify research gaps, for creative scientific problem-solving.
Manage and trigger pre-built Zapier workflows and MCP tool orchestration. Use when user mentions workflows, Zaps, automations, daily digest, research, search, lead tracking, expenses, or asks to "run" any process. Also handles Perplexity-based research and Google Sheets data tracking.
Provide qualitative-first, evidence-traceable developmental review of scholarly works and audit low-stakes research-assessment rubrics with optional local quality controls. Never use for ranking people or consequential decisions.
Guides researchers through structured ideation frameworks to discover high-impact research directions. Use when exploring new problem spaces, pivoting between projects, or seeking novel angles on existing work.
Loop 2 of the Three-Loop Integrated Development System. META-SKILL that dynamically compiles Loop 1 plans into agent+skill execution graphs. Queen Coordinator selects optimal agents from 86-agent registry and assigns skills (when available) or custom instructions. 9-step swarm with theater detection and reality validation. Receives plans from research-driven-planning, feeds to cicd-intelligent-recovery. Use for adaptive, theater-free implementation.
Loop 1 of the Three-Loop Integrated Development System. Research-driven requirements analysis with iterative risk mitigation through 5x pre-mortem cycles using multi-agent consensus. Feeds validated, risk-mitigated plans to parallel-swarm-implementation. Use when starting new features or projects requiring comprehensive planning with <3% failure confidence and evidence-based technology selection.
Take biotender-max/experiment-pipeline from the repository into ~/.claude/skills for personal
use, or into .claude/skills inside a project.
The agent identifies a skill by the name field in its header. Two skills with the
same name cannot sit side by side — one of them will be ignored.