mcpbeat Sign in

Zovo Project Timeline MCP Server

answering

Zovo Project Timeline is answering right now. Last checked 12 min ago. It exposes 2 tools.

A Gantt chart maker and project timeline planner that works inside the chat.

Uptime history 67 hours of history
67 hours agonow
100.0%
Uptime 24h
91 of 91 checks
2
Tools
read from the server
232 ms
Response time
average over 24h
open, no key
Access
streamable-http

Nothing serious here today

Today is the operative word: we check Zovo Project Timeline every 15 minutes and re-read its code on every release. Watch it and you find out the day that stops being true.

Three servers free · no card

Connect this server

Endpoint below is the one we actually reach during checks — not the one copied from a README. Last verified 12 min ago.

run in your terminal
claude mcp add gantt-timeline --transport http https://gantt-timeline.zovo.one/mcp
Settings → Connectors → Add custom connector, then paste this address
https://gantt-timeline.zovo.one/mcp
~/.codex/config.toml
[mcp_servers.gantt-timeline]
url = "https://gantt-timeline.zovo.one/mcp"
.cursor/mcp.json
{
  "mcpServers": {
    "gantt-timeline": {
      "url": "https://gantt-timeline.zovo.one/mcp"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "gantt-timeline": {
      "type": "http",
      "url": "https://gantt-timeline.zovo.one/mcp"
    }
  }
}

Available tools 2

Read directly from the server with tools/list, grouped by what they act on. If a tool disappears, we record the date.

compare
compare_timeline_scenarios
Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).
plan
plan_project_timeline
Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.

Endpoints

URLTransportStateLatencyChecked
https://gantt-timeline.zovo.one/mcp streamable-http answering 581 ms 12 min ago

Alternatives to Zovo Project Timeline

same job, measured the same way
Madda Tasks
by maddatech

Project scheduling: Gantt chart, dependencies, baselines, reports and AI agents

answering
Zovo Org Chart Maker
by theluckystrike

Org charts from a team list

1 tools answering
Zovo Seating Chart
by theluckystrike

Make a classroom seating chart or a wedding seating chart that follows your rules, then print it.

2 tools answering
GraphMake
by graphmake

Turn data into infographics (PNG/SVG): 90+ templates, or KPI cards, charts, timelines and maps.

6 tools answering
Trade Chart
by openkrill

A candlestick chart for a public ticker, with volume, the indicators you name and a plain read.

3 tools answering
Gantt Chart
by theluckystrike

Build Gantt charts from your AI chat: tasks, dependencies, timeline spreadsheets. All data is local.

13 tools answering
Mode VC Chart: AI Productivity Statistics: What AI Users Say They Gain
by modevc

86% of surveyed Claude users say AI makes them faster and 82% say it widens what they can do..

3 tools answering
Mode VC Chart: AI in the Workplace Statistics: What Workers Gain
by modevc

Among US employees who use AI, 63% say it makes them faster but only 46% say it raises.

3 tools answering

Zovo Project Timeline — questions

Answers built from our own checks of this server.

What can Zovo Project Timeline do?
It exposes 2 tools, read directly from the server on our last check. Among them: compare_timeline_scenarios, plan_project_timeline. The full list with descriptions is on this page — we take it from the server itself via tools/list, not from a README. How MCP servers expose tools in the first place →
Is Zovo Project Timeline working right now?
We send a real MCP handshake every 15 minutes. Over the last 24 hours 91 of 91 checks got a reply (100.0%), average response time 232 ms. The bar chart above shows every period we have measured.
How do I connect Zovo Project Timeline?
Copy the ready config from this page. We generate it for Claude Code, Claude Desktop, Codex, Cursor and VS Code, each in the form that client actually reads. It is a remote server, so there is nothing to install — the client connects to the address.
Does Zovo Project Timeline need an API key?
No. Zovo Project Timeline completed a full MCP handshake with us as an anonymous client and listed its tools without asking for anything. All 2 of them are readable on this page. This is what we observed, not what the docs claim.
How fast is Zovo Project Timeline?
It answers our handshake in 232 ms on average, which is faster than 64% of all working MCP servers we measure. The comparison comes from our own checks across the whole registry, every 15 minutes.