Pathline Project Planner is answering right now. Last checked 12 min ago. It exposes 1 tools.
Project planning tool for critical path calculations.
Today is the operative word: we check Pathline Project Planner every 15 minutes and re-read its code on every release. Watch it and you find out the day that stops being true.
Endpoint below is the one we actually reach during checks — not the one copied from a README. Last verified 12 min ago.
claude mcp add critical-path --transport http https://critical-path.zovo.one/mcp
https://critical-path.zovo.one/mcp
[mcp_servers.critical-path]
url = "https://critical-path.zovo.one/mcp"
{
"mcpServers": {
"critical-path": {
"url": "https://critical-path.zovo.one/mcp"
}
}
}
{
"servers": {
"critical-path": {
"type": "http",
"url": "https://critical-path.zovo.one/mcp"
}
}
}
Read directly from the server with tools/list, grouped by what they act on.
If a tool disappears, we record the date.
calculate_critical_path
| URL | Transport | State | Latency | Checked |
|---|---|---|---|---|
| https://critical-path.zovo.one/mcp | streamable-http | answering | 306 ms | 12 min ago |
AI-powered project planning tools for Autoplans.dev with 14+ MCP tools
Offline MCP server for planning structured project specs — validate, render, and checklist tools.
Scan AI agents for tool-calling vulnerabilities: prompt leaks, hijacking, injections, and more.
Decision planning tool for a weighted decision matrix.
Project memory and a control plane for AI coding agents.
Local tools for planning and validating focused browser-game prototypes.
Engineering calculation MCP server for oil and gas engineering applications.
MCP server for managing i18n translations in Nuxt projects.
Answers built from our own checks of this server.