mcpbeat Sign in

New Building Permit Leads MCP Server

answering

New Building Permit Leads is answering right now. Last checked 10 min ago.

New building permits from 7 US cities scored as leads by trade, job value and contractor

Uptime history 72 hours of history · worst hour 75%
72 hours agonow
98.9%
Uptime 24h
90 of 91 checks
—
Tools
hidden behind auth
349 ms
Response time
average over 24h
API key
Access
streamable-http

New Building Permit Leads missed one check this week

Everything else answered, so this is steady rather than shaky. We check every 15 minutes, which is how a one-off gets told apart from the start of a pattern, and how you hear about the next one within the hour instead of from your users.

Three servers free · no card

Connect this server

Endpoint below is the one we actually reach during checks — not the one copied from a README. Last verified 10 min ago.

run in your terminal
claude mcp add building-permit-leads --transport http 'https://mcp.apify.com/?tools=nerolabs/building-permit-leads'
Settings → Connectors → Add custom connector, then paste this address
https://mcp.apify.com/?tools=nerolabs/building-permit-leads
~/.codex/config.toml
[mcp_servers.building-permit-leads]
url = "https://mcp.apify.com/?tools=nerolabs/building-permit-leads"
.cursor/mcp.json
{
  "mcpServers": {
    "building-permit-leads": {
      "url": "https://mcp.apify.com/?tools=nerolabs/building-permit-leads"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "building-permit-leads": {
      "type": "http",
      "url": "https://mcp.apify.com/?tools=nerolabs/building-permit-leads"
    }
  }
}

This endpoint answered with an authorization challenge. The server is running, but you need an API key from its owner to call it.

Endpoints

URLTransportStateLatencyChecked
https://mcp.apify.com/?tools=nerolabs/building-permit-leads streamable-http needs key 363 ms 10 min ago

Alternatives to New Building Permit Leads

same job, measured the same way
Dibsline Permits
by dibsline

Newly issued building permits in 10 US cities, with trade tags and job values, daily.

answering
PermitStack
by permit-stack

U.S. building permits, permit histories by address and contractors from city and county records.

6 tools answering
Whitetape
by jonathantech1217

US building permits as rows with the contractor of record. Free search; 7 cents a row, no account.

771 installs/wk local only
C
contractors.fyi
by contractors

US contractors ranked by city permits, permit costs and timelines, solar and generator sizing.

8 tools answering
Contractors Near Me
by contractorsnearme

Search licensed US contractors by trade or location, fetch profiles and reviews, and submit leads.

14 tools answering
FirstDig
by firstdig

New US building permits by trade and service area: search, hot streets, builders and results.

answering
Building Permits API
by gaelasao

Building permits from 18 US cities (NYC, LA, Chicago, Philadelphia...), Canada, Ireland, France.

answering
Permit Scouter
by permitscouter

Daily Tampa Bay, Southwest and Central Florida permits with job value and contractor. Pay via x402.

6 tools answering

New Building Permit Leads — questions

Answers built from our own checks of this server.

Why is there no tool list for New Building Permit Leads?
The server answered our handshake with an authorization challenge, so it is running — but it will not describe its tools to an anonymous client. To see them you need to connect with your own credentials. We record it as alive, not as broken: 98.9% of checks in the last 24 hours got a reply.
Is New Building Permit Leads working right now?
We send a real MCP handshake every 15 minutes. Over the last 24 hours 90 of 91 checks got a reply (98.9%), average response time 349 ms. The bar chart above shows every period we have measured.
How do I connect New Building Permit Leads?
Copy the ready config from this page. We generate it for Claude Code, Claude Desktop, Codex, Cursor and VS Code, each in the form that client actually reads. It is a remote server, so there is nothing to install — the client connects to the address. You will need your own key: it refuses anonymous clients.
Does New Building Permit Leads need an API key?
Yes. Every time we knock, New Building Permit Leads answers with an authorization challenge instead of its tool list — that is how we know it is running and gated rather than broken. Bring your own credentials and it will talk.
How fast is New Building Permit Leads?
It answers our handshake in 349 ms on average, which is faster than 40% of all working MCP servers we measure. The comparison comes from our own checks across the whole registry, every 15 minutes.