mcpbeat Sign in

Loadfactor: business electricity and gas supply, solar and EV charging quotes MCP Server

answering

Loadfactor: business electricity and gas supply, solar and EV charging quotes is answering right now. Last checked 8 min ago. It exposes 8 tools.

A site's electricity, gas, solar or EV charging, specified the way suppliers and installers price.

Uptime history 70 hours of history
70 hours agonow
100.0%
Uptime 24h
91 of 91 checks
8
Tools
read from the server
431 ms
Response time
average over 24h
open, no key
Access
streamable-http

What changed 7

Every tool that appeared, vanished or quietly changed what it asks for. Recorded since 5 November 2026. No other catalogue keeps this.

6 Nov 5 tools appeared accept_offer, decline_offer, inspect_offer and 2 more
6 Nov a tool changed the parameters it asks for submit_request
5 Nov a tool changed the parameters it asks for submit_request

Nothing serious here today

Today is the operative word: we check Loadfactor: business electricity and gas supply, solar and EV charging quotes every 15 minutes and re-read its code on every release. Watch it and you find out the day that stops being true.

Three servers free · no card

Connect this server

Endpoint below is the one we actually reach during checks — not the one copied from a README. Last verified 8 min ago.

run in your terminal
claude mcp add loadfactor --transport http https://loadfactor.forevenza.com/mcp
Settings → Connectors → Add custom connector, then paste this address
https://loadfactor.forevenza.com/mcp
~/.codex/config.toml
[mcp_servers.loadfactor]
url = "https://loadfactor.forevenza.com/mcp"
.cursor/mcp.json
{
  "mcpServers": {
    "loadfactor": {
      "url": "https://loadfactor.forevenza.com/mcp"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "loadfactor": {
      "type": "http",
      "url": "https://loadfactor.forevenza.com/mcp"
    }
  }
}

Available tools 8

Read directly from the server with tools/list, grouped by what they act on. If a tool disappears, we record the date.

accept
accept_offer
Place an order on terms you have inspected and the buyer has authorized you to accept. Requires the exact terms hash and explicit acceptance. Follow inspect_offer later for payment links and verified payment state.
decline
decline_offer
Decline an issued offer on its inspected terms.
describe
describe_proposition
Everything about one service: what happens to a request, what you get, scope and limits, the request fields and any operations.
inspect
inspect_offer
Read the exact authorized terms, terms hash, order state and processor payment links. Use the offer link credentials, or credentials of the request explicitly linked to this offer.
propositions
list_propositions
List Loadfactor's services with a one-line summary: lookups that run instantly, and requirements you can send.
release
release_payment
Confirm a payment condition only where the inspected order allows the customer to release it. This records approval; it does not pay the processor.
request
request_status
Resume a requirement using the receipt credentials. Read the recorded requirement and any linked offers. Contact details are kept apart.
submit
submit_request
Send a requirement to one of Loadfactor's services. It is kept with a reference number.

Endpoints

URLTransportStateLatencyChecked
https://loadfactor.forevenza.com/mcp streamable-http answering 366 ms 8 min ago

Alternatives to Loadfactor: business electricity and gas supply, solar and EV charging quotes

same job, measured the same way
BillPeak
by openkrill

Check a business electricity bill against the utility's published rates and find a cheaper plan.

4 tools answering
W
Way.com
by way

Book parking, car washes, EV charging, gas and auto repair across the US with live pricing.

answering
The Ranking Factory
by therankingfactory

Whether AI answers name and cite your business: runs, gaps, cited sources, published evidence.

answering
Bayline: truckload, LTL and intermodal freight lanes; warehouse space requirements
by forevenza-services

Truck lanes and warehouse space, specified the way carriers and landlords quote them.

8 tools answering
Trades With AI + SaaS Price Watch
by tradeswithai

Read-only data: AI tools for trades businesses and public SaaS pricing, with source quotes.

6 tools answering
Brick NJ Local directory
by bricknjlocal

Businesses in Brick Township, NJ: hours, phones, and booking or quotes where offered.

7 tools answering
Before the Lot
by beforethelot

Car-buying math and state rules: out-the-door prices, quote checks, leases and trade-ins

16 tools answering
Villiers Charter
by villiers

Instant private jet charter price estimates and confirmed live quotes, worldwide.

6 tools answering

Loadfactor: business electricity and gas supply, solar and EV charging quotes — questions

Answers built from our own checks of this server.

What can Loadfactor: business electricity and gas supply, solar and EV charging quotes do?
It exposes 8 tools, read directly from the server on our last check. Among them: accept_offer, decline_offer, describe_proposition, inspect_offer, list_propositions, release_payment and 2 more. The full list with descriptions is on this page — we take it from the server itself via tools/list, not from a README. How MCP servers expose tools in the first place →
Is Loadfactor: business electricity and gas supply, solar and EV charging quotes working right now?
We send a real MCP handshake every 15 minutes. Over the last 24 hours 91 of 91 checks got a reply (100.0%), average response time 431 ms. The bar chart above shows every period we have measured.
How do I connect Loadfactor: business electricity and gas supply, solar and EV charging quotes?
Copy the ready config from this page. We generate it for Claude Code, Claude Desktop, Codex, Cursor and VS Code, each in the form that client actually reads. It is a remote server, so there is nothing to install — the client connects to the address.
Does Loadfactor: business electricity and gas supply, solar and EV charging quotes need an API key?
No. Loadfactor: business electricity and gas supply, solar and EV charging quotes completed a full MCP handshake with us as an anonymous client and listed its tools without asking for anything. All 8 of them are readable on this page. This is what we observed, not what the docs claim.
How fast is Loadfactor: business electricity and gas supply, solar and EV charging quotes?
It answers our handshake in 431 ms on average, which is faster than 30% of all working MCP servers we measure. The comparison comes from our own checks across the whole registry, every 15 minutes.