mcpbeat Sign in

Energieausweis Express MCP Server

by energieausweis-express Your server? Claim it
answering

Energieausweis Express is answering right now. Last checked 6 min ago. It exposes 11 tools.

Prepare a German Energieausweis (energy certificate); an Energieberater checks and signs it.

Uptime history 16 hours of history
16 hours agonow
100.0%
Uptime 24h
57 of 57 checks
11
Tools
read from the server
112 ms
Response time
average over 24h
open, no key
Access
streamable-http

What changed 1

Every tool that appeared, vanished or quietly changed what it asks for. Recorded since 1 November 2026. No other catalogue keeps this.

1 Nov a tool changed the parameters it asks for answer_inquiry

Nothing serious here today

Today is the operative word: we check Energieausweis Express every 15 minutes and re-read its code on every release. Watch it and you find out the day that stops being true.

Three servers free · no card

Connect this server

Endpoint below is the one we actually reach during checks — not the one copied from a README. Last verified 6 min ago.

run in your terminal
claude mcp add energieausweis --transport http https://energieausweis-express.de/mcp
Settings → Connectors → Add custom connector, then paste this address
https://energieausweis-express.de/mcp
~/.codex/config.toml
[mcp_servers.energieausweis]
url = "https://energieausweis-express.de/mcp"
.cursor/mcp.json
{
  "mcpServers": {
    "energieausweis": {
      "url": "https://energieausweis-express.de/mcp"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "energieausweis": {
      "type": "http",
      "url": "https://energieausweis-express.de/mcp"
    }
  }
}

Available tools 11

Read directly from the server with tools/list, grouped by what they act on. If a tool disappears, we record the date.

answer
answer_inquiry
Answers the open question (Rückfrage) about an ordered certificate with the customer's answers: values keyed by the item keys get_status listed, files the question asks for, and an explanation. Ask the customer first and send only what they confirmed.
building
find_building
Finds the building at a German address in our 3D building data. Returns the building at the address first, then nearby buildings, each with a building_ref for start_order and a short German description (type, storeys, footprint). If several addresses match, returns them instead: ask the user which one is meant. Where the address may be one of several buildings (semi-detached or terraced houses, several buildings on one plot), ask the user which is theirs. Changes nothing.
certificate
get_certificate
Returns download links for the issued certificate and its invoice (PDF). The links work for one hour and open nothing else, so they can be shown to the user; call again for fresh ones. The customer also got both by email. Changes nothing.
document
add_document
Uploads a file to a draft order: an energy bill or Heizkostenabrechnung (rechnung) or a photo (street side, heating, type plate). JPG, PNG, WebP or PDF as base64, at most 10 MB, 20 files per order. Bills are read and compared with the entered consumption after the customer has ordered; the Energieberater checks the photos. Usually the customer takes the photos on our page after the confirmation email. Orders nothing.
eligibility
check_eligibility
Checks whether Energieausweis Express can issue a Verbrauchsausweis (consumption-based energy certificate) for a residential building in Germany, before any order exists. Returns yes or no with the reason in German (including the rule for houses with a Bauantrag before 1 November 1977 and the change on 1 January 2027), the all-inclusive price, the delivery time and what is needed. Changes nothing.
listing
get_listing_facts
Returns what a property listing must state about the energy certificate (§ 87 GEG): type of certificate, Endenergieverbrauch, main energy carrier of the heating, year built and Effizienzklasse, as ready-to-paste German text. Only once the certificate is issued. Changes nothing.
order
update_order
Enters or corrects data of a draft order: facts about the building, the heating, and the consumption periods as printed on the bills, in the bill's unit (kWh; m3 of gas, with the bill's Brennwert and Zustandszahl; litres of oil; kg of pellets; we convert). The consumption is always the whole building's, also when the customer owns one flat: from a Heizkostenabrechnung take the Gesamtverbrauch der Liegenschaft, never the customer's own share. Send only what you know: fields left out stay as they are, and consumption.periods replaces all periods. Synonyms such as 'Gas' or 'heat pump' are accepted. Values are marked as entered by an assistant; the customer sees and confirms them before ordering. Returns the order as it is now and the open points. Orders nothing.
request
request_confirmation
Sends the customer one email with a link to their prepared order on our website. This does NOT order or charge anything: the customer checks the data there, adds what is missing (usually photos of the street side and the heating) and orders and pays on our page themselves. Before calling it, ask the user for permission and tell them the price review_order returned and that they will get an email, e.g. 'Soll ich das für <Preis> bei Energieausweis Express vorbereiten? Sie bekommen dann eine E-Mail, prüfen alles und bestellen selbst.' Needs the customer's name, the email address they gave for this order, and who orders. One email per order plus one resend (e.g. to a corrected address); the link is valid for 7 days. Afterwards tell the user to look for the email with the subject 'Ihr Energieausweis ist vorbereitet – bitte prüfen und bestellen', also in the spam folder.
review
review_order
Shows the order's data and what it still needs before the customer can order: the open points (which field to send, and in German why), whether a Verbrauchsausweis is possible, the price, and a preliminary result once the consumption is complete. Changes nothing.
start
start_order
Starts a draft order for the building the user confirmed (building_ref from find_building). Orders and charges nothing. Returns order_id and order_token, which every later tool needs; the token opens only this order, so keep it private and never show it to anyone. Also returns what our 3D building model and the cadastre already say about the building (estimates the customer can correct) and the open points.
status
get_status
Shows where the order stands, in plain German words: prepared, ordered, being checked by the Energieberater, waiting for an answer to a Rückfrage (with its questions), issued. Changes nothing.

Endpoints

URLTransportStateLatencyChecked
https://energieausweis-express.de/mcp streamable-http answering 88 ms 6 min ago

Alternatives to Energieausweis Express

same job, measured the same way
ecoExperten Energieausweis
by ecoexperten

Order official German energy certificates (Energieausweis) from chat — on invoice, 1-2 days.

4 tools answering
Soma
by medianemi-beep

Execution-verified code generation and verification with signed, offline-checkable certificates.

42 installs/wk local only
D
Dropcoin Invoice
by freshfos

German e-invoicing: generate XRechnung 3.0, pre-check and extract (incl. ZUGFeRD PDF). Paid.

3 tools answering
Leemu OKRs
by leemu

Read OKRs, submit key-result check-ins, and generate progress reports in Leemu.

answering
Boring Utils Expiry Watch
by hal-boring-utils

Check a site's TLS certificate and its domain registration expiry. Read-only, no sign-in.

2 tools answering
UK EPC MCP
by donniertf-hub

UK energy performance certificates (EPC) by postcode and address. Free sample; £0.49 pack.

3 tools answering
X509 MCP
by mrfentmen

Decode PEM certificates, check expiry and inspect a live TLS certificate, all offline

597 installs/wk local only
Uk Epc
by pipeworx-io

UK Energy Performance Certificate (EPC) register MCP (fleet #3270).

273 installs/wk 47 tools answering

Energieausweis Express — questions

Answers built from our own checks of this server.

What can Energieausweis Express do?
It exposes 11 tools, read directly from the server on our last check. Among them: add_document, answer_inquiry, check_eligibility, find_building, get_certificate, get_listing_facts and 5 more. The full list with descriptions is on this page — we take it from the server itself via tools/list, not from a README. How MCP servers expose tools in the first place →
Is Energieausweis Express working right now?
We send a real MCP handshake every 15 minutes. Over the last 24 hours 57 of 57 checks got a reply (100.0%), average response time 112 ms. The bar chart above shows every period we have measured.
How do I connect Energieausweis Express?
Copy the ready config from this page. We generate it for Claude Code, Claude Desktop, Codex, Cursor and VS Code, each in the form that client actually reads. It is a remote server, so there is nothing to install — the client connects to the address.
Does Energieausweis Express need an API key?
No. Energieausweis Express completed a full MCP handshake with us as an anonymous client and listed its tools without asking for anything. All 11 of them are readable on this page. This is what we observed, not what the docs claim.
How fast is Energieausweis Express?
It answers our handshake in 112 ms on average, which is faster than 90% of all working MCP servers we measure. That puts it in the quick quarter of the ecosystem. The comparison comes from our own checks across the whole registry, every 15 minutes.