The instruction itself
19 sections, as written by the author
Launch Runbook
Plan and execute the launch of a website, product, or major release. The runbook is the document everyone uses on launch day. Stack-agnostic.
This skill is for the launch event. For pre-launch QA, use qa-testing. For post-launch incident handling, use incident-response.
When to use
Launching a new website or major redesign
Migrating from one platform to another
Releasing a major product or feature
Coordinating cross-team launches
Building a runbook for a recurring deploy
When NOT to use
Pre-launch testing (use qa-testing)
Post-launch incident response (use incident-response)
After-launch retrospective (use after-action-report)
The launch scope (what's being launched)
The launch window (date, time, duration)
The team (roles, on-call rotation)
The rollback criteria (when to abort)
The communication plan (who tells whom what, when)
The framework: 4 phases
A launch has four phases. The runbook covers all four.
Phase 1: Pre-launch (T-30 days to T-1 hour)
Verify everything is ready before the launch window.
T-30 days:
Final scope locked
Cross-team commitments confirmed
Pre-launch QA scheduled
Comms plan drafted
T-7 days:
Pre-launch QA complete
All critical and major issues resolved
Performance baseline measured
Rollback procedures documented and tested
DNS TTL lowered (if DNS change is part of launch)
T-1 day:
Final go/no-go meeting
Roles confirmed
Communication channels set up
Backup of current production state
T-1 hour:
Team assembled in shared communication channel
Tools and access verified
Final smoke test on staging
Phase 2: Cutover (T-0)
The actual launch. Sequenced steps with owners and verifications.
Standard cutover steps:
Announce start to internal team
Enable maintenance mode (if applicable)
Run final database migrations (if applicable)
Deploy code to production
Verify deploy completed without errors
Run smoke tests on production
DNS cutover (if applicable)
Verify DNS propagation
Disable maintenance mode
10. Run full smoke tests on production
11. Announce launch to internal team
12. Begin monitoring window
Each step has:
Owner
Pre-conditions
Action
Verification
Time estimate
Rollback procedure
Phase 3: Verification (T+0 to T+24 hours)
Confirm the launch is healthy.
Within first hour:
Critical user flows working (checkout, signup, login)
No spike in error rates
Performance within expected ranges
Analytics tracking firing
Email and notifications working
Within first 24 hours:
No regression in key business metrics
No accumulating error patterns
Core Web Vitals stable
Search Console showing no critical issues (if SEO-relevant)
Phase 4: Stabilization (T+24 hours to T+7 days)
Monitor the long tail.
Track error rates day over day
Track performance day over day
Track key business metrics vs baseline
Address any non-blocking issues identified
Plan the AAR (after-action report)
Roles and responsibilities
A launch has clear role assignments. Ambiguity here is the most common cause of launch chaos.
| Role | Responsibility |
|---|---|
| Launch lead | Owns the runbook. Calls go/no-go. Calls rollback. |
| Deploy operator | Executes the technical deploy steps. |
| QA lead | Runs verification tests and confirms each milestone. |
| Comms lead | Posts internal updates, manages external messaging. |
| On-call engineer | Available for issues during and after launch. |
| Stakeholder rep | Approves on behalf of business stakeholders. |
For small teams, one person may fill multiple roles. Each role's responsibilities should still be explicit.
Rollback criteria
Define before the launch. Decisions are easier to make pre-emptively than under pressure.
Automatic rollback triggers:
Error rate exceeds X percent of normal
Critical user flow (defined) is broken
Database integrity issue
Security vulnerability discovered post-deploy
Discretionary rollback triggers:
Performance degradation beyond Y percent
Significant degradation in key business metric
Customer-facing error patterns
Decision authority: The launch lead calls rollback. Pre-define who acts as deputy if launch lead is unavailable.
Communication plan
Internal channels
Primary launch channel: Real-time chat for the launch team only
Status channel: Broader internal updates
War room: Optional video call for high-stakes launches
Update cadence during launch
Every 15 minutes during cutover
Every hour during verification phase
Daily during stabilization phase
External communication
Customer-facing announcement: Pre-drafted, scheduled to publish at confirmed-success milestone
Status page: Updated proactively if any user impact
Support team: Briefed in advance on what's launching, common questions, escalation path
Workflow
Build the runbook 30 days out. Scope, sequence, roles, rollback criteria, comms plan.
Test the rollback procedure. Untested rollback is hope, not procedure.
Run a tabletop exercise. Walk through the runbook with the full team. Find gaps.
Lower DNS TTL 48 to 72 hours before launch (if DNS change is part of launch).
Day-of: Run the runbook step by step. Verify each step before moving to next.
Monitor. First hour, first day, first week. Document anything noteworthy.
Schedule the AAR within 1 to 2 weeks of launch.
Failure patterns
Runbook written by one person, not reviewed. Single perspective misses scenarios.
No tested rollback. Discovering rollback is broken at the moment you need it.
Vague step descriptions. "Deploy to production" without specifying which tool, which command, which environment.
No verification step after each action. Errors propagate.
Communication gaps. Team doesn't know launch is happening, or doesn't know it succeeded.
Launching at end of day Friday. Or before a holiday. Reduce the time available to respond.
Skipping pre-launch QA to hit a date. The bugs appear on launch day instead.
Launch fatigue. Long launches without breaks lead to errors. Plan rest cycles for multi-day launches.
No on-call for first 24 hours. Someone must be reachable.
Default output: a markdown runbook at launch-runbook-[project].md plus supporting checklists.
Structure:
Launch metadata (what, when, who)
Roles and responsibilities
Pre-launch checklist (T-30, T-7, T-1, T-1hr)
Cutover sequence (numbered steps, owners, verifications)
Rollback procedure
Rollback criteria (automatic and discretionary)
Communication plan
Verification checklist (first hour, first day)
Stabilization plan (first week)
10. Contacts (escalation paths, on-call)
Reference files
references/runbook-template.md - Fillable runbook template with example cutover sequences.