Design, critique, route, and implement Gantt charts and schedule visualizations. Use when the user mentions Gantt charts, project schedules, roadmaps with task spans, milestones, dependencies, predecessors, critical path, baselines, WBS, resource plans, capacity timelines, MS Project, Primavera P6, Jira Advanced Roadmaps, GitHub Projects, Smartsheet, monday.com, Asana, ClickUp, Azure DevOps iterations, or importing/exporting project-management data for a timeline chart.
12k tokens
context cost
the whole folder, loaded on every use
8
files
instructions only
0
copies elsewhere
how many repositories repackaged it
4915
stars on the repo
on the repository, not the skill itself
Install
one command, takes just this skill from the repository
Use this skill when work is organized around time spans, milestones, dependencies, resources, or schedule risk. A Gantt chart is a product surface as much as a chart: it usually combines a task grid, a calendar axis, bars, milestones, dependency links, editing rules, and integration with a project-management source of truth.
Default assumption: recommend a Gantt chart only when the schedule itself is the evidence. If the user mainly needs flow state, task ownership, ranking, issue status, or calendar booking, consider Kanban, tables, milestone timelines, dependency graphs, resource timelines, or uncertainty views first.
Gantt charts are wide by nature. Use ../../references/foundations/mobile-first-responsive-visualization.md so mobile portrait gets a usable summary or focused slice, and mobile landscape is considered when horizontal schedule inspection matters.
Core Workflow
Classify the scheduling question:
planned schedule, actual lifecycle timeline, roadmap, resource plan, capacity view, baseline variance, critical-path review, or stakeholder snapshot
whether the user needs read-only explanation, exploratory analysis, or editable project planning
Inspect the source before designing:
true schedule engine, task tracker, roadmap view, resource calendar, static export, or visual artifact
native fields, custom fields, date-only versus datetime values, timezone policy, hierarchy, dependency semantics, calendars, and permissions
provenance for every mapped field and any inferred value
Normalize into a Gantt model:
tasks, hierarchy or WBS, start, end, duration, progress, status, assignee or resource, milestones, dependencies, baselines, calendars, constraints, estimates, actuals, source IDs, and source confidence
Decide whether Gantt is the right surface:
use Gantt when time spans and dependency or resource reasoning drive the decision
use a milestone timeline for executive summaries with few dates
use Kanban for workflow state and throughput
use a table when lookup and exact fields dominate
use a dependency graph when structure matters more than dates
use a calendar or resource timeline for booking without project dependencies
use uncertainty views when date risk is probabilistic or estimates are still unstable
Design the default view:
frozen task grid plus calendar axis
today marker, visible scale, weekends or non-working time when meaningful
clear bars, milestones, dependency links, baselines, progress, and critical-path or risk styling
row grouping, hierarchy, and direct labels that work without hover
mobile portrait summary or focused default that does not shrink every row into illegibility
mobile landscape behavior when wide timeline reading, dependency tracing, or editing is important
Define the interaction contract:
zoom and pan, row virtualization, expand/collapse, search, filter, sort, hover preview, committed selection, keyboard navigation, drag/resize, dependency editing, undo/redo, export, and deep links
touch targets, drag alternatives, keyboard-open search/filter behavior, and settings-return behavior on mobile
Choose the renderer and library against real scale:
rows, visible time range, dependency count, editability, instance count, export requirements, and source-system sync needs
Plan testing and release gates:
data adapter tests, date/time fixtures, dependency graph validation, visual states, accessibility, export, and E2E scheduling workflows
When To Use Gantt
Project schedules with tasks that have start and finish dates.
Work breakdown structures, phases, releases, epics, construction schedules, manufacturing plans, implementation plans, launch plans, and migration cutovers.
Dependency chains where slippage affects downstream work.
Critical-path, float, baseline, deadline, or variance analysis.
Resource allocation, capacity planning, or workload conflicts over time.
Cross-team roadmaps when the question is "what happens when" rather than "what status is this in."
Schedule imports from MS Project, Primavera P6, Jira Advanced Roadmaps, GitHub Projects, Smartsheet, monday.com, Asana, ClickUp, Azure DevOps, or CSV/XLSX exports.
When Not To Use Gantt
Small or highly fluid work where a simple list, table, or Kanban board is clearer.
Issue queues where status, priority, owner, or SLA matters more than planned span.
Executive summaries with only releases or launch dates; use a milestone timeline or roadmap.
Booking, appointments, or shift planning without task dependencies; use a calendar or resource timeline.
Pure dependency reasoning without reliable dates; use a graph or matrix.
Probabilistic schedules or early estimates where uncertainty is the main story; use interval, scenario, or risk views.
Actual lifecycle analysis based only on created, started, and closed timestamps unless the user explicitly asks for actual flow history instead of a planned schedule.
Stack Selection
Enterprise editable schedule: use Bryntum Gantt, DHTMLX Gantt, Kendo UI Gantt, Syncfusion Gantt, or a comparable scheduling component when dependency editing, calendars, baselines, critical path, resource views, undo, import/export, and scheduling rules are product requirements.
Lightweight display or reporting: use Highcharts Gantt, Frappe Gantt, Plotly timelines, Observable Plot, or similar when the view is mostly read-only and the schedule semantics are already computed.
Resource booking or team availability: use FullCalendar resource timeline or a scheduler-style component when resources and calendar slots matter more than WBS scheduling.
Small editorial schedule: use D3/SVG or a declarative grammar when labels, annotation, vector export, and precise composition matter.
Large dense product surface: use a virtualized hybrid layout with HTML for grid text, SVG or Canvas for bars and dependency links, and Canvas for dense bar/link layers when DOM cost dominates.
Avoid raw WebGL unless mark count, continuous pan/zoom, GPU picking, or custom shader effects make Canvas and DOM impractical.
Reference Guide
Read references/gantt-chart-design-and-use-cases.md for chart-fit decisions, use cases, and alternatives.
Read references/gantt-interaction-patterns.md for interactive product behavior and editing contracts.
Read references/gantt-api-and-export-format-ingestion.md before mapping MS Project, Primavera, Jira, GitHub Projects, Smartsheet, monday.com, Asana, ClickUp, Azure DevOps, CSV, TSV, XLSX, JSON, PDF, or image exports.
Read references/gantt-data-contracts-and-integrations.md when defining adapters, normalized schemas, source provenance, sync, or product API contracts.
Read references/gantt-performance-and-rendering.md before choosing SVG, Canvas, hybrid rendering, virtualization, or enterprise libraries for large schedules.
Read references/gantt-accessibility-export-and-testing.md for keyboard navigation, screen-reader fallbacks, export, fixtures, and release gates.
Output Expectations
State whether Gantt is the primary recommendation or name the better alternative.
State whether the source is planned schedule data, actual lifecycle data, a roadmap snapshot, a resource calendar, or a static visual artifact.
Identify which fields are trusted, mapped, inferred, or missing.
Include the canonical schedule model, minimum interactions, stack choice, performance assumptions, accessibility plan, and export path.
For external sources, preserve source IDs and call out ambiguous custom fields instead of silently treating them as schedule truth.
For editable schedules, call out validation and conflict behavior for drag, resize, dependency changes, calendars, baselines, and sync failures.
For mobile, call out portrait summary or focused slice, landscape support if needed, touch/editing alternatives, keyboard behavior, and offline/stale sync behavior for remote schedules.