nwave-ai/nwave-nw-par-review-criteria
Quality dimensions and review checklist for devop reviews
This is a copy. The original lives at nwave-ai/nw-par-review-criteria.
npx skills add https://github.com/nWave-ai/nWave --skill nw-par-review-criteria
Pattern: Phase handoffs missing required artifacts or approvals.
Required per Phase:
Severity: critical. Verify all artifacts present and peer-reviewed before phase transition.
Pattern: Feature marked "ready" but missing production prerequisites.
Required: All tests passing (100%) | Production configuration complete | Monitoring/alerting configured | Runbook/operational docs created | Rollback plan documented.
Severity: critical. Complete missing prerequisite before marking deployment-ready.
Pattern: Cannot trace production code back to requirements.
Required: User stories map to acceptance tests | Acceptance tests map to production code | Code changes traceable to commits | All AC verified in production.
Severity: high. Establish traceability chain: user-story -> acceptance-tests -> code-commits.
Purpose: Validate roadmap addresses largest bottleneck first, not secondary concern.
Q1: Is this the largest bottleneck?
Does timing data show primary problem? Larger problem being ignored? Assessment: YES / NO / UNCLEAR.
Q2: Were simpler alternatives considered?
Roadmap includes rejected alternatives? Rejection reasons evidence-based? Simpler solution achieves 80% benefit? Assessment: ADEQUATE / INADEQUATE / MISSING.
Q3: Is constraint prioritization correct?
Constraints quantified by impact? Architecture addresses constraint-free opportunities first? Minority constraint dominating? (flag if >50% of solution for <30% of problem). Assessment: CORRECT / INVERTED / NOT_ANALYZED.
Q4: Is architecture data-justified?
Key architectural decision supported by quantitative data? Different data leads to different architecture? Assessment: JUSTIFIED / UNJUSTIFIED / NO_DATA.
Purpose: Verify feature wired into system entry point -- prevents Testing Theatre.
A feature with 100% test coverage but 0% wiring tests is not complete.
Validation Criteria:
Gate failure response: Block finalization | report specific integration gap with evidence | require integration step before completion.
Take nwave-ai/nwave-nw-par-review-criteria from the repository into ~/.claude/skills for personal
use, or into .claude/skills inside a project.
The agent identifies a skill by the name field in its header. Two skills with the
same name cannot sit side by side — one of them will be ignored.