github/doc-and-modernize
>- Two related workflows for a locally-cloned codebase, in one skill. Documentation mode produces a single, comprehensive, verifiable architecture document primarily by reading files on disk (local-first) — use it whenever the user wants to understand, map, document, research, or onboard onto a codebase ("research this repo", "write up the architecture", "do an architecture deep dive", "document how this codebase works", "map the system design", "create an onboarding doc"). Modernization mode generates a phased plan to modernize, migrate, upgrade, or rewrite a legacy system ("modernize this", "plan the migration", "how would we rewrite this", "how do we get off this legacy stack"); if no architecture document exists yet it first runs Documentation mode, then continues straight through to the plan. It assumes the legacy stack may be dead, runs a time-boxed feasibility spike, and picks the highest achievable rung on a safety ladder instead of demanding a fully-green legacy CI gate up front.
npx skills add https://github.com/github/awesome-copilot --skill doc-and-modernize
Two complementary workflows for a repository the user already has checked out
locally, bundled as one skill:
from the code on disk. Ideal for onboarding, system-design maps, or as the
evidence base for a modernization effort.
plan to upgrade, migrate, or rewrite a legacy system.
codebase, run Documentation mode.
Modernization mode. Modernization mode is self-sufficient: if no
architecture document exists yet, it runs the Documentation mode workflow
first (in the same pass), then continues straight through to the plan.
When in doubt, produce the architecture document first — it is the audited
evidence base both modes rely on.
Generate one definitive, cited architecture document for a repository the user
already has checked out locally. The goal is a writeup someone could hand to a
new engineer as their onboarding reference — broad enough to cover the whole
system, deep enough on the hard parts to be useful, and trustworthy because
every claim traces back to a file on disk.
Reading from the local checkout (not the GitHub API or the web) is the deliberate
default. It is faster, free, avoids rate limits, and — most importantly — it
describes *the exact code in front of you* rather than whatever main happens
to look like remotely. The one tradeoff is that remote-only facts (star counts,
full CI run history, sibling repos) aren't visible. That's fine: state those as
out-of-scope or mark them [UNVERIFIED] rather than guessing.
Local-first is not local-*never*-remote: a web/API lookup is a deliberate
last-resort fallback, reserved for a fact that genuinely cannot be determined
from disk and that materially matters to the document. When you do reach for it,
flag the result clearly (e.g. [UNVERIFIED] / sourced-remotely) so the reader
knows it didn't come from the checkout, and never let it become the easy path
that displaces reading the code on disk.
git remote -v, git branch --show-current,and git log -1 so the document is anchored to a specific remote, branch, and
commit. A reader must be able to tell which snapshot this describes. Remote
URLs can contain embedded credentials (e.g. https://<token>@github.com/...)
— redact any credentials/tokens from the URL before recording it in the
document.
go.mod, package.json,Cargo.toml, pyproject.toml, pom.xml, etc.), the Makefile/task runner,
CI config, and any repo-specific agent or contributor docs (AGENTS.md,
CONTRIBUTING, README, docs/). These are the source of truth for the tech
stack and commands — prefer them over your prior knowledge of the framework.
three lenses below), then pick the 2-3 hardest subsystems and go deep on them.
you should have actually read that line. Unsupported claims are worse than
omissions here — the whole value of this document is that it can be trusted.
Produce a single Markdown file with the sections below, in this order. Adapt
the headings to the actual project (a CLI tool has no "frontend" lens — fold that
slot into whatever matters for that repo), but keep the three-lens shape and the
verification discipline.
commands (command | purpose | evidence), verified against the task runner /
manifests / CI config, not guessed. Cover build, run/serve, test (and how to
run a single test), lint, format, and — where they exist — typecheck,
end-to-end/smoke, contract, and any other gate commands, plus the CI
workflow(s) that run them and on what trigger. **Also record whether CI is
*enforced* — i.e. whether any workflow is a required status check /
branch-protection rule** that actually blocks merges, versus one that merely
runs — since that distinction is a manual, human-configured setting that
Modernization mode must surface, not assume. Enforcement usually cannot be
determined from the local checkout alone: ask the user, or mark it
[UNVERIFIED] unless confirmed from an authoritative source (any remote
lookup is a flagged last resort, per the local-first rule above). This
inventory is the source of
truth that downstream planning (Modernization mode) cites so its exit
criteria are runnable, not aspirational. Detect these per-ecosystem (npm/yarn/
pnpm, make, just, cargo, go, poetry/tox/nox, gradle/maven,
etc.) — do not assume a stack. Mark any command you could not verify
[UNVERIFIED].
and backing-service versions are pinned *for running* the system (not just
building it): container base images (Dockerfile/Containerfile,
docker-compose* build contexts), CI runner images / setup-* versions,
engines/.nvmrc/.tool-versions/runtime.txt, serverless/lambda runtimes,
and stateful data-store image tags (DB/cache/broker/search). Cite each with
file+line. This surface is what a later platform/runtime bump must move in
lockstep — flag any drift between build-runtime and run-runtime here so it's
visible before a modernization plan is written.
and libraries that are end-of-life, unmaintained, or removed in a likely target
major (e.g. a framework whose next major renames namespaces or drops a
component family). Mark each [INFERRED]/[UNVERIFIED] as appropriate. This is
the raw material Modernization mode's feasibility spike and hazard red-team
build on.
pre-commit hooks) — each cited.
visible from disk* (build tags, optional linked repos, separately-deployable
components). Don't import remote ecosystem trivia.
Level 3 a representative request/component lifecycle.
error handling, feature flags — each with its location and evidence.
CODEOWNERS, review gates, compatibility rules).
Identify the 2-3 most complex or architecturally significant subsystems — the
parts a new engineer would most struggle with, such as an evaluation/scheduling
engine, a plugin loader pipeline, a state machine, or a rendering/migration
framework. For each, add a dedicated subsection covering its internal structure,
lifecycle or state machine, key types, and data flow, with local file+line
citations and a small Mermaid diagram where it clarifies the flow. This is what
separates a useful onboarding doc from a directory listing — spend real effort
here.
A table of the major claim areas rated High / Inferred / Unverified, so a
reader knows exactly which parts to trust outright and which to double-check.
A list of the key local files the document relies on, each with a one-line note
on what it establishes.
These are the habits that distinguish this skill's output from a generic
overview. They matter because the document's entire value is that a reader can
rely on it without re-deriving everything.
pins something specific (pkg/server/server.go#L39-L41). Relative paths from
the repo root keep links clickable.
[INFERRED] for something you reasoned tobut didn't see stated, and [UNVERIFIED] for something you're repeating but
didn't confirm (e.g. a build-timing claim from a doc you didn't re-measure).
Honest gaps are more useful than false confidence.
version literal in code vs. the manifest), go read the code, decide the real
answer, and label it [Resolved contradiction] with the explanation. Leaving
a reader to puzzle over a conflict is a failure mode.
FE/BE PRs, bidirectional storage compatibility, additive-only protobuf changes
— because these are the rules a newcomer most easily breaks.
files" (from a directory listing) reads as verified; "many services" reads as a
guess.
Keep the document grounded in the checkout. It's easy to drift outward into the
project's wider ecosystem (related products, README marketing, satellite repos)
— resist that unless it's visible on disk, and clearly label anything that comes
from outside the local tree. The reader asked for *this codebase*, documented
faithfully.
Generate a complete, actionable modernization plan for a legacy codebase. This
skill focuses on the forward-looking work — what to modernize, why, in what
order, and how — but it is self-sufficient: it ensures an architecture
document exists first, producing one via Documentation mode when needed.
Assume dead-by-default. People reach for modernization precisely because the
old stack is hard or impossible to upgrade — EOL runtimes, uncompilable native
modules, retired package mirrors, abandoned frameworks. So this skill does not
assume you can resurrect the legacy toolchain and stand up a fully-green CI gate
before touching anything. That "freeze-then-lift" approach is the *lucky* case,
not the default. Instead the skill runs a time-boxed feasibility spike, then
picks a migration strategy and a safety strategy matched to how alive the
system actually is. On a truly dead app, building a green legacy gate *is itself
a modernization project* — a circular trap this skill is designed to avoid.
Three ideas drive the whole plan and are introduced below: the **Testability
Milestone** (when — per component — the system can actually build, run, and pass
a test again), the safety ladder (the highest rung of regression safety
you can actually reach, with a downgrade treated as a blessed outcome, not a
failure), and the CI Milestone (which phase first stands up CI — and the
reminder that *enforcing* CI as a required check is a manual human step, not
something the agent can do).
This skill needs an understanding of the system's architecture before it can
plan. Resolve that as follows:
above, or a README / ARCHITECTURE.md the user points to, or enough
prior conversation context — use it and skip to the workflow below.
generate a cited architecture document, then continue straight through
to Phase 1 below in the same pass. Do not stop to ask the user to run it
separately, and do not pause for review between the two documents.
The result is two artifacts: the architecture document (the audited evidence
base) and this modernization plan (the forward-looking action set).
Before planning, confirm a Commands & Verification Inventory exists. Exit
criteria are only worth anything if they are *runnable*, so the plan must be able
to cite the project's canonical build / run / test / lint / typecheck / e2e /
contract commands and CI gate(s). Documentation mode produces this
inventory in Part 1; if you're working from a README or prior context that lacks
it, detect and record those commands yourself (per-ecosystem — npm/yarn/pnpm,
make, just, cargo, go, poetry/tox/nox, gradle/mvn, etc.) before
writing exit criteria. Never invent a command you haven't verified against the
task runner / manifests / CI config.
Read the architecture document and extract:
versions where visible
architectural violations noted in the existing docs
Do NOT re-read every source file. Trust the architecture doc. Only open specific
files if a modernization question requires verifying a detail (e.g., "is this
dependency actually used or just declared?").
This is the pivot of the whole plan. **Do it before recommending a target
architecture or writing any phases.** Its job is to answer, quickly and honestly:
*how alive is this system, what migration shape fits, and how much regression
safety can we actually achieve?*
Put a hard time box on it (e.g. one day). The spike's question is **NOT "can
we make CI green?" — it is "can we get this to run even *once* to capture its
behavior?"** Probe, per component / deployable unit:
lockfile without hand-patching**)?
Record what you actually observed — including partial success (common in
monorepos: one service installs and tests green while another can't compile). Do
not sink two sprints resurrecting a corpse to discover it's unresurrectable.
When the time box expires, decide with the evidence you have.
**"Testable" is not a precondition you can satisfy on a dead app — for a dead app
it is an *output* of modernization, not an input.** So every plan must name, up
front, its Testability Milestone: the specific phase at which the system
(or a given component) first satisfies all four conditions at once:
Assess this per component — as the reference Nylas run showed, a near-modern
cloud service can cross the line immediately while a legacy Electron client
doesn't cross it until several phases later. **This milestone is the single most
important marker in the plan.** State where it lands for each component, out loud.
The Testability Milestone splits the effort into two regimes with **different
safety rules**:
Safety comes from non-test sources (see the safety ladder below).
Requiring a CI test gate here is a category error — you're demanding green
tests from something that isn't alive yet.
stack. *Now* real CI, characterization, and e2e are achievable and worth the
investment. The classic green-gate belongs here.
**Rule: never require an automated test gate on a component before that component
crosses its own testability line.**
The spike decides which of two shapes fits (this is a per-component call in a
monorepo):
Requires the old app to be resurrectable at acceptable cost — i.e. it
*almost* runs. This is the traditional "characterization tests before you
change anything" path. Opt-in, not the default.
the thinnest possible end-to-end slice onto the modern stack until it
builds, boots, and tests; then strangle the rest in, writing tests **on the new
stack as you go. This is the default for dead apps.** In strategy B, the
first phase is *"reach the Testability Milestone with the smallest slice,"* not
*"freeze the whole legacy toolchain."*
If a component can't be built or run at all, characterization tests on the
*old* stack are impossible by definition — invert the approach: **stop trying to
net the corpse and build the net on the *target* stack incrementally**, using the
old code/output as the reference oracle.
Regression safety is a ladder, not a binary. Choose the **highest rung you can
actually reach per component; a downgrade to a lower rung is a blessed,
first-class outcome — not a failure — provided the residual risk is named.**
subset; the rest quarantined with a named list.
I/O snapshots / behavioral diffs (manual is acceptable).
reversible steps, strangler / parallel-run, a smoke checklist, and review.
or archive.
Safety is not only tests. There are at least five sources, and on dead apps
2–4 often outweigh 1:
dead apps.
diff outputs.
characterize behavior without a test harness.
Anchor safety at the behavioral *seams*, not the unit. The durable,
stack-agnostic contracts of any app are its externally observable behaviors:
HTTP endpoints, DB schema/queries, file/wire formats, CLI output, protocols. Pin
*those* as golden-master / approval snapshots — **they survive the rewrite; unit
tests on dead legacy code get deleted the moment you replace the module.** Get an
oracle, ranked by what's available:
and you're allowed to use it: record real I/O and replay it against the new
code. One successful capture beats a permanent green legacy CI. *(Do not assume
this rung is always available — a faithful third-party reimplementation or a
resurrected legacy binary may be off-limits by policy, licensing, or an
explicit decision to build "with only what we have." If so, skip to the
self-frozen rung.)*
supplement with prod logs, DB dumps, docs, tickets, and accept that
characterization tests get written against the new implementation to lock
it once verified correct.
when nothing trustworthy runs *and* you may not borrow an external oracle, the
modernized component records its *own* golden master the moment it first runs
(at its Testability Milestone), and every later phase diffs against that frozen
snapshot. This is a real, usable rung — but name its residual risk out loud:
it guarantees the *self-consistency of later refactors*, not the correctness
of the first boot (the snapshot is only as correct as the run that produced it).
Pair it with human review / spec cross-checks to bless that first run.
Weigh regression cost when picking a rung: Is the app in production? Does
it have real users? Is the old system still runnable as a reference? An
abandoned app with zero users has near-zero regression cost — an expensive gate
there is over-engineering. A production system with users justifies a higher
rung and a real oracle.
Just as the Testability Milestone names *when a component can first run and be
tested*, the CI Milestone names *when continuous integration is first stood
up* — and it must be **stated out loud in the roadmap, not buried in a phase
body.** A common failure of modernization plans is leaving the reader unable to
tell which phase introduces CI; name it explicitly.
**Rule: CI is stood up in the *first lit phase* — at or immediately after the
component crosses its Testability Milestone — never before.** CI cannot be green
on a component that cannot yet build/run, so wiring a CI *gate* during the dark
regime is the same category error as demanding a test gate there. (Trivial
scaffolding — a lint-only or build-only workflow — may appear earlier, but the
authoritative test gate lands at the CI Milestone.)
CI is two distinct steps, and the second is human-only — call both out:
.github/workflows/*.yml, .gitlab-ci.yml,Azure Pipelines) that runs the gate. An agent can do this.
branch-protection rule / merge-request approval rule**. This is a manual
platform-UI / admin step (GitHub → Settings → Branches; GitLab protected
branches + MR settings; etc.) that an agent cannot perform. Until a human
configures it, CI *runs* on PRs but does not *block* merges.
Because step 2 is outside the agent's reach, **every plan that stands up CI must
emit it as an explicit user action item** (in the phase's exit criteria and in
§9 Open questions / decisions needed from stakeholders), so the reader knows the
gate is not self-enforcing until they turn it on.
Output of Phase 2: for each component — the spike result, the chosen strategy
(A or B), the located Testability Milestone, the pre/post label, and the target
safety-ladder rung with any residual risk named — **plus the plan-wide CI
Milestone** (which phase stands up CI) and the reminder that enforcing it is a
manual human step. Everything downstream depends on these.
The strategic scaffolding above (testability, safety ladder, CI milestone) is
necessary but not sufficient. Modernization plans also fail on *tactical,
ecosystem-predictable* hazards — an incomplete quarantine set, a forgotten
namespace codemod, a runtime bump that leaves the base images behind, a stateful
data-store major treated as an image bump, an edge rewrite that drops the
anonymous route class. These are so recurring that they have their own catalog:
references/migration-hazards.md (H1–H8).
**Rule: before any phase is implemented, red-team its plan against every hazard
in references/migration-hazards.md.** For each hazard, ask "does this phase
trigger it?", run the hazard's detection probe against the real repo, and fold
its plan action into the phase's tasks/exit criteria before writing code. A
hazard caught in planning is a task; caught in review it's rework; caught in prod
it's an incident. Record hazards you checked and cleared, not just the ones
that fired — a silent skip is indistinguishable from a miss.
This is the institutionalized form of an independent-critic pass. Do it yourself
by walking the catalog, and — where an independent second opinion is available
(e.g. a rubber-duck / critique agent) — use it: on the reference PiggyMetrics run
such a pass caught a blocking plan gap in every single phase, and each gap
was an instance of an H1–H8 class. Bake the outcome into each phase's
"Decisions made" and exit criteria so the executing agent inherits the cleared
checklist rather than re-discovering the hazard.
Decision framework — always evaluate in this order:
For each component/dependency, work through these levels from least-disruptive to
most-disruptive. Stop at the first level that solves the problem:
(e.g., Node 14→22, Python 2→3, React 16→19, Rails 5→7). This is the default
answer. Only reject it if the upgrade path is officially unsupported, the
breaking changes are so extensive they exceed rewrite cost, or the framework
itself is abandoned/EOL.
fine, can you swap to a maintained alternative with the same interface shape?
(e.g., Moment.js → date-fns, Request → got/fetch, CoffeeScript → TypeScript
with decaffeinate). Prefer drop-in or mechanical migration tools when they
exist.
internals are unmaintainable, can you put a clean interface in front and
incrementally replace internals behind it? This works when coupling is
manageable and the system can run with old and new coexisting.
architecture fundamentally cannot support required new capabilities (e.g.,
synchronous-only design that must become real-time), or honest estimation shows
upgrade cost exceeds rewrite cost. Require explicit justification for every
rewrite recommendation — "it's old" is not sufficient.
superseded by other systems. Verify usage claims before recommending removal.
Bias toward conservatism. The cheapest migration is the one you don't do.
Every level of disruption adds risk, timeline, and cost. A working system on an
older framework is better than a half-finished rewrite on a new one.
**Mechanical-migration riders (apply whenever a recommendation is an upgrade,
swap, or removal).** These are the parts of a target-architecture decision that
first-draft plans routinely drop; each maps to a hazard class in
references/migration-hazards.md:
dependency family, grep the dead artifact across all manifests and list the
*full* set of dependents that must move or be quarantined — not the subset you
first thought of. State the post-cutover build target explicitly.
changes independent of your logic — namespace renames, removed deprecated APIs,
a changed test engine, changed config keys. Enumerate each as its own task
and prefer the ecosystem's automated recipe/codemod tool (OpenRewrite,
jscodeshift/react-codemod, 2to3/pyupgrade, etc.) over hand-editing on large
trees. Don't forget the test-framework migration — it is the most-forgotten one.
language/runtime major, every place the runtime is pinned for *running* the
app — base images, docker-compose build contexts, CI runner images,
engines/.nvmrc/.tool-versions, serverless runtimes — must move in the
same phase. Build-runtime and run-runtime must never drift across a phase
boundary, or the app builds green and then fails to run.
Produce a Target Architecture section that includes:
runtime, database, infrastructure)
services, event-driven, serverless, etc.) with justification
the decision framework above:
For each recommendation, write an inline ADR:
#### ADR: [Decision Title]
- **Context:** [Why this decision is needed]
- **Decision:** [What we chose and which decision framework level it falls under]
- **Alternatives considered:** [What else was evaluated and why it lost]
- **Consequences:** [Tradeoffs accepted]
For each major feature/domain identified in the architecture doc, produce a
section covering:
(Freeze-then-lift vs. Beachhead/walking-skeleton), plus the tactic: Strangler
Fig, Big Bang rewrite, Lift & Shift, Incremental Refactor, or Leave In Place
lands, and its safety-ladder rung (L0–L4) with residual risk named
against the chosen oracle/seam contracts, not against a not-yet-alive test
suite)
Produce an ordered, phased plan. Each phase should be independently deployable
(no half-migrated states that can't run in production).
Phase gating is regime-aware (applies to every phase). State this rule at the
top of the phased plan and honor it in every phase's exit criteria. A phase is
not complete until its Verification & Exit Criteria pass. Those criteria must
be (a) objectively verifiable; (b) actually executed and recorded before
the next phase starts; and (c) gated — do not advance to phase N+1 until
phase N's criteria are demonstrably met. **But which criteria are valid depends
on the component's regime (Phase 2c):**
CI — green CI on the phase's branch/PR is the authoritative signal.
CI test gate is a category error. Exit criteria come from the achievable
safety-ladder rung instead — captured seam/oracle snapshots, reversibility
scaffolding proven present, a passed smoke checklist, recorded review. Do not
block a dark-regime phase on a test suite that can't run yet.
Report to the user any phase whose pass/fail is unknown rather than assuming it
passed.
**The first phase establishes maximum *achievable* safety — not a fixed "green
legacy gate."** Do not hard-code "resurrect everything and make CI green." Shape
the first phase from the Phase 2 outputs, per component:
*is* the classic Safety Net & Baseline — purely additive, no behavior change:
current observable behavior (protocol traces, API snapshots, output goldens).
lit-regime phases).
baseline (versions, toolchain, how it builds and runs today).
protocol code or return value), confirm the new tests go red, then
revert. A safety net that never fails is proof of nothing — prove it has
teeth.
is "reach the Testability Milestone with the smallest slice" — drive the
thinnest end-to-end path onto the modern stack until it builds, boots, and runs
≥1 real test green, capturing seam/oracle contracts from the old system to
validate against. Do not try to net the corpse. Its exit criterion is the
achievable safety-ladder rung with residual risk named — a **blessed downgrade
is not a failure.**
Only after the first phase's criteria are met (at whatever rung) do the
subsequent infrastructure and feature phases begin.
Structure each phase as:
### Phase N: [Name] (T-shirt size: M)
**Goal:** [One sentence]
**Regime:** [pre-testability ("dark") | post-testability ("lit")] — per component
**Safety rung:** [L0–L4, with residual risk named if below L4]
**Prerequisites:** [Which phases must complete first]
**Duration estimate:** [Relative, not calendar — e.g., "2-4 sprints"]
#### Tasks
| ID | Task | Component | Blocked by |
|----|------|-----------|------------|
| N.1 | ... | ... | — |
| N.2 | ... | ... | N.1 |
#### Risks & Mitigations
- **Risk:** ... → **Mitigation:** ...
#### Decisions made
- [Every sub-decision this phase depends on, resolved and documented here so the
phase can be implemented without further user input. State "dropped" vs
"deferred" explicitly for anything cut.]
#### Verification & Exit Criteria (Definition of Done)
- [ ] [Regime-appropriate criterion. For LIT phases: a runnable command / green
CI check, citing the actual command from the Commands & Verification
Inventory. For DARK phases: the achievable safety-ladder rung's evidence —
captured seam/oracle snapshots, reversibility proven, smoke checklist
passed — NOT a green test suite the component can't yet run.]
- [ ] [Include a parity/characterization check against the chosen oracle whenever
the change is meant to preserve behavior.]
- [ ] [If purely additive, assert it: "no behavior/dependency/logic changed."]
- [ ] [If exiting below L4, state the residual risk and which later phase closes
it (e.g., "client test gate deferred to the client-migration phase").]
Ordering principles:
smallest slice that reaches it early rather than deferring "testable" to the end
while demanding a gate at the start.
testability line.**
up CI (the first *lit* phase, at/after the Testability Milestone) so the reader
never has to guess when CI arrives — and flag that *enforcing* it (required
status check / branch protection) is a manual human step, not an agent task.
achievable rung (not necessarily a full green gate) before modifying behavior.
Modernization plans fail in execution, not on paper. Bake in the governance that
keeps each phase honest and reversible (generic across any ecosystem):
PR per phase; let CI on the PR be the authoritative green signal before merge
for lit-regime phases. For dark-regime phases, the PR still carries the
rung's evidence (captured contracts, smoke results, reversibility scaffolding).
is cut from trunk, and its PR is **merged to trunk before the next phase
starts**. Never base a phase branch or its PR on a *sibling* phase branch — that
is how PRs get merged into each other, the trunk silently stalls several phases
behind, and later phases are forced into the exact bind where the no-stacking
rule has to be broken. Before starting a phase, verify the previous phase is
merged to trunk and git log origin/<trunk>..HEAD is empty at branch creation.
**If controlled stacking is genuinely unavoidable, it is allowed only with a
required reconciliation PR that lands the stack onto trunk and an explicit
residual-risk note** — never as a silent default.
(e.g. main) and, if a second default-ish branch exists (master), mark it
"history only — do not target" so phase work never lands on the wrong branch.
advance on the achievable safety-ladder rung with residual risk named — not on
a "looks done" judgement, and not on a test suite that can't run yet.
Name the phase that introduces CI (the first lit phase). Distinguish the two
steps: authoring the workflow file is agent-doable; making it an **enforced
required status check / branch-protection (or MR-approval) rule is a manual
platform-UI step the agent cannot perform.** Until a human configures it, CI
*runs* but does not *block* merges — so record "enable branch protection /
required checks" as an explicit user action item (in the CI phase's exit
criteria and in §9 stakeholder decisions), never as a completed agent task.
system runnable, so rollback = redeploy the previous version. Prefer
interface-preserving rewrites (wrap internals behind a stable interface) and
prove equivalence with the seam/oracle contracts (golden/characterization
tests where they exist).
MODERNIZATION_PLAN.md status markers as each phase'sexit criteria are met — ✅ complete / ⏭️ descoped / 🗑️ dropped — record the
decisions made during implementation, and **update the safety-ladder rung /
residual-risk register** as components cross their testability lines.
only the plan file. Any phase that changes topology — module/reactor
membership, removed services, renamed branches, changed commands, new/removed
endpoints — must update .github/copilot-instructions.md, the README, and any
module/topology list in the same PR. Treat those doc updates as part of the
phase's Definition of Done, not a follow-up — a stale "quarantined module" list
or a hard-coded old-branch link actively misleads the next agent/human.
against references/migration-hazards.md (H1–H8) and fold the fixes into tasks
and exit criteria before writing code. Record the cleared checklist in the
phase's "Decisions made".
.github/copilot-instructions.md(create the .github/ directory if needed) from the template at
references/copilot-instructions.template.md — a commands table plus the
regime-aware phase-gate and branch/PR rules — so the executing agent/human has
the canonical commands and gates in the location GitHub Copilot auto-loads. The
user edits it to their own gates. If a .github/copilot-instructions.md already
exists, do not overwrite it — merge the commands/gating/branch sections in, or
write the generated file alongside as
.github/copilot-instructions.modernization.md and tell the user to merge.
Document the operational guardrails needed:
For a stateful data-store major upgrade with persisted volumes (H5), an
engine image/tag bump is not a migration: pick and document one path —
a sequential/feature-compatibility-version upgrade with steps + rollback, or
an explicit destructive reset (drop volumes, re-seed) when the data is
ephemeral/demo — stated as a deliberate decision, with the prior-major image
retained for rollback. (e.g. Mongo 3→7 over an existing /data/db volume needs
down -v + re-seed for a demo, or a staged FCV upgrade for real data.)
introduced to keep the system runnable mid-migration (permit-all shims, CSRF
disabled, an open endpoint, a placeholder secret) listed with: why it's needed,
the phase that closes it, the residual risk, and a by-design-until-phase-N
note for reviewers. Scope each weakening as tightly as possible (e.g. a
permit-all chain should still explicitly disable form-login/HTTP-Basic).
Pre-declaring these converts recurring scanner/reviewer churn into a tracked
decision.
snapshots (or a self-frozen golden master, when no external reference is
available or permitted) serve as the behavioral reference, and how new work is
diffed against them
stack as components cross their testability line), and what stays quarantined
Produce a primary Markdown file named MODERNIZATION_PLAN.md with:
A/B migration strategy, the located Testability Milestone, the target
safety-ladder rung, and a residual-risk register for anything below L4;
plus the plan-wide CI Milestone (which phase stands up CI) with a note that
*enforcing* it is a manual human step
safety rung (not a fixed green legacy gate); every phase is labeled
pre/post-testability and carries regime-appropriate, gated exit criteria; the
CI Milestone phase is named explicitly and lists "enable branch protection
/ required status checks" as a manual user action
platform-configuration handoffs the agent cannot perform (e.g. enabling
required status checks / branch protection to make CI an enforced gate)
Also emit a companion .github/copilot-instructions.md (the path GitHub
Copilot auto-loads; create .github/ if absent) from
references/copilot-instructions.template.md, populated with the project's
canonical commands and phase-gating / branch rules, for whoever executes the
plan to edit and adopt. Never overwrite an existing
.github/copilot-instructions.md — merge into it or write a sibling
.github/copilot-instructions.modernization.md and flag it for the user.
restating everything. Keep this document forward-looking.
State what you'd pick and why. The user can override.
once is fiction. Identify what's phase 1 vs. "future consideration."
all the sub-decisions its implementation depends on, already decided and
documented (the "Decisions made" block), so the phase can be executed without
going back to the user. State "dropped" vs "deferred" explicitly for
anything cut — they are not the same. Reserve [DECISION NEEDED] for genuine
*stakeholder/business* choices (budget, team size, product direction, timeline
pressure) that block a phase; drive those to resolution with the user during
planning rather than leaving them open in an implementable phase.
maintenance burden, "leave it alone" is a valid recommendation.
legacy CI gate up front. Run the feasibility spike, pick the highest achievable
safety-ladder rung, and treat a downgrade as a blessed outcome with residual
risk named — never a failure.
Milestone** per component and never require a component's automated test gate
before that component crosses its own testability line.
stands up CI (the first lit phase), and make explicit that turning CI into an
*enforced* required check / branch-protection rule is a manual platform step
the agent cannot do — surface it as a user action item, not a done task.
contracts (protocols, schemas, wire/file formats, endpoints) with a ranked
oracle (running instance → recorded I/O → code-as-spec → **self-frozen golden
master** when no external reference exists or is permitted). Don't sink sprints
resurrecting a dead toolchain just to run a test that gets deleted at rewrite.
package manager / test runner / CI — never assume a specific stack.
against references/migration-hazards.md and fold the fixes into tasks/exit
criteria first — a hazard caught in planning is a task; in review, rework; in
prod, an incident. These tactical hazards (incomplete quarantine, framework
codemods, runtime/base-image lockstep, route-class enumeration, data-store
upgrade paths, transitional-insecure-state noise, stacked-PR/trunk drift,
living-doc drift) are what strategic scaffolding alone keeps missing.
Take github/doc-and-modernize from the repository into ~/.claude/skills for personal
use, or into .claude/skills inside a project.
The agent identifies a skill by the name field in its header. Two skills with the
same name cannot sit side by side — one of them will be ignored.