abhinavbwj/cost-estimation
>- Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects. Covers building construction cost per m2 by typology, infrastructure cost per linear meter and per dwelling, site preparation, landscaping, professional fees, and financial feasibility analysis. Use when the user asks about project cost, construction cost, infrastructure budget, development feasibility, cost per unit, cost per m2, capital expenditure, opex, cost benchmarking, value engineering, phasing costs, or any question about how much an urban design project or its components will cost. Also use for preliminary budget estimation, order-of- magnitude costing, cost comparison between design alternatives, or cost optimization of masterplans.
npx skills add https://github.com/Abhinavbwj/Urban-Design-Skills-Claude --skill cost-estimation
This skill provides a systematic framework for estimating the capital costs
of urban design projects at the masterplan and district scales. It draws on
international construction cost benchmarks (Turner & Townsend, Rider Levett
Bucknall, AECOM, Arcadis), infrastructure costing guides (CIRIA, ASCE),
and development appraisal methodology (RICS Red Book, ULI).
All costs are provided in USD (2025 baseline) with regional adjustment
factors. The goal is to enable early-stage cost estimation accurate to
+/- 25-30% (AACE Class 4 estimate) sufficient for masterplan feasibility
and design option comparison.
Costs include structure, envelope, MEP, finishes, and contractor overhead and
profit. Exclude land, professional fees, and site infrastructure (those are
separate categories below).
Residential
| Type | Low | Medium | High | Premium |
|------|-----|--------|------|---------|
| Detached house | $800 | $1,200 | $1,800 | $2,500+ |
| Townhouse / row house | $750 | $1,100 | $1,600 | $2,200+ |
| Low-rise apartment (1-3 floors) | $900 | $1,300 | $1,800 | $2,400+ |
| Mid-rise apartment (4-10 floors) | $1,100 | $1,600 | $2,200 | $3,000+ |
| High-rise apartment (11-25 floors) | $1,400 | $2,000 | $2,800 | $4,000+ |
| Super-tall apartment (25+ floors) | $2,000 | $2,800 | $4,000 | $6,000+ |
| Affordable housing (basic spec) | $600 | $900 | $1,200 | N/A |
| Student housing | $900 | $1,300 | $1,700 | $2,200 |
| Senior housing / care home | $1,200 | $1,800 | $2,500 | $3,500 |
Commercial
| Type | Low | Medium | High | Premium |
|------|-----|--------|------|---------|
| Office (standard) | $1,200 | $1,800 | $2,500 | $3,500+ |
| Office (Grade A / LEED Platinum) | $1,800 | $2,500 | $3,500 | $5,000+ |
| Retail (shell and core) | $700 | $1,000 | $1,400 | $2,000 |
| Retail (fitted out) | $1,000 | $1,500 | $2,200 | $3,500+ |
| Hotel (3-star) | $1,400 | $2,000 | $2,800 | N/A |
| Hotel (5-star) | $2,500 | $3,500 | $5,000 | $8,000+ |
| Supermarket | $800 | $1,100 | $1,500 | $2,000 |
| Food hall / market | $900 | $1,400 | $2,000 | $3,000 |
Civic / Institutional
| Type | Low | Medium | High | Premium |
|------|-----|--------|------|---------|
| Primary school | $1,200 | $1,800 | $2,500 | $3,500 |
| Secondary school | $1,400 | $2,000 | $2,800 | $4,000 |
| University building | $1,800 | $2,500 | $3,500 | $5,000 |
| Healthcare clinic | $1,500 | $2,200 | $3,200 | $4,500 |
| Hospital | $2,500 | $3,500 | $5,000 | $7,500 |
| Community center | $1,000 | $1,500 | $2,200 | $3,000 |
| Library | $1,400 | $2,000 | $3,000 | $4,500 |
| Place of worship | $800 | $1,400 | $2,500 | $5,000+ |
| Fire / police station | $1,200 | $1,800 | $2,500 | N/A |
| Sports hall / indoor courts | $1,000 | $1,500 | $2,200 | $3,200 |
Parking
| Type | Cost per Space | Cost per m2 |
|------|----------------|-------------|
| Surface lot | $3,000-5,000 | $100-170 |
| Structured above-grade | $20,000-35,000 | $570-1,000 |
| Underground (1 level) | $35,000-50,000 | $875-1,250 |
| Underground (2+ levels) | $45,000-65,000 | $1,125-1,625 |
| Automated / mechanical | $30,000-60,000 | $1,500-3,000 |
Apply these multipliers to the base costs above:
| Region | Factor | Notes |
|--------|--------|-------|
| US Northeast / California | 1.20-1.40 | High labor costs |
| US Southeast / Midwest | 0.85-1.00 | Base region |
| US Southwest | 0.90-1.05 | |
| Western Europe (UK, France, Germany) | 1.10-1.35 | |
| Northern Europe (Scandinavia) | 1.30-1.60 | High labor, weather |
| Southern Europe (Spain, Italy, Greece) | 0.80-1.00 | |
| Eastern Europe | 0.50-0.75 | |
| GCC / Gulf States | 0.90-1.20 | Imported materials and labor |
| India | 0.25-0.45 | |
| China (Tier 1 cities) | 0.40-0.65 | |
| Southeast Asia | 0.30-0.55 | |
| Australia / New Zealand | 1.15-1.40 | |
| Sub-Saharan Africa | 0.40-0.70 | Supply chain premium |
| Latin America | 0.35-0.60 | |
| Japan / South Korea | 1.00-1.30 | |
Building cost increases with height due to structural requirements, vertical
transportation, and construction complexity:
| Floors | Premium over Low-Rise Base |
|--------|---------------------------|
| 1-3 | 1.00x (base) |
| 4-6 | 1.05-1.10x |
| 7-10 | 1.10-1.20x |
| 11-15 | 1.15-1.30x |
| 16-25 | 1.25-1.45x |
| 26-40 | 1.40-1.70x |
| 41-60 | 1.60-2.00x |
| 60+ | 2.00-2.50x+ |
| Certification Level | Additional Cost |
|---------------------|-----------------|
| Basic compliance (code minimum) | 0% (baseline) |
| LEED Silver / BREEAM Good | 1-3% |
| LEED Gold / BREEAM Very Good | 2-5% |
| LEED Platinum / BREEAM Outstanding | 5-10% |
| Net Zero Carbon | 8-15% |
| Net Zero Energy | 10-20% |
| Passive House standard | 5-15% |
| Mass timber structure (CLT) | 0-8% (varies; sometimes cost-neutral) |
| Element | Unit | Low | Medium | High |
|---------|------|-----|--------|------|
| Local street (full build) | per linear meter | $800 | $1,500 | $2,500 |
| Collector street (full build) | per linear meter | $1,500 | $2,800 | $4,500 |
| Arterial road (full build) | per linear meter | $3,000 | $5,500 | $9,000 |
| Sidewalk (concrete, 2m wide) | per linear meter | $100 | $180 | $300 |
| Protected cycle track (one-way) | per linear meter | $150 | $300 | $500 |
| Protected cycle track (two-way) | per linear meter | $200 | $400 | $700 |
| Asphalt resurfacing | per m2 | $15 | $30 | $50 |
| Concrete paving (vehicular) | per m2 | $40 | $70 | $120 |
| Unit paving (pedestrian areas) | per m2 | $60 | $120 | $250 |
| Traffic signal (full intersection) | each | $80,000 | $200,000 | $400,000 |
| Roundabout (single lane) | each | $200,000 | $500,000 | $1,000,000 |
| Pedestrian bridge | per linear meter | $5,000 | $15,000 | $40,000 |
| Vehicular bridge | per m2 deck | $2,000 | $4,000 | $8,000 |
| Utility | Unit | Low | Medium | High |
|---------|------|-----|--------|------|
| Water main (150-300mm) | per linear meter | $150 | $300 | $500 |
| Water main (300-600mm) | per linear meter | $300 | $600 | $1,000 |
| Sewer (gravity, 200-400mm) | per linear meter | $200 | $400 | $700 |
| Sewer (gravity, 400-800mm) | per linear meter | $400 | $800 | $1,400 |
| Storm drain (300-600mm) | per linear meter | $150 | $350 | $600 |
| Storm drain (600-1200mm) | per linear meter | $400 | $800 | $1,500 |
| Pump station (water) | each | $200,000 | $500,000 | $1,500,000 |
| Pump station (sewer) | each | $300,000 | $800,000 | $2,000,000 |
| Water treatment (per ML/day) | each | $500,000 | $1,500,000 | $4,000,000 |
| Wastewater treatment (per ML/day) | each | $800,000 | $2,500,000 | $6,000,000 |
| Power distribution (underground HV) | per linear meter | $300 | $600 | $1,200 |
| Power distribution (underground LV) | per linear meter | $100 | $250 | $500 |
| Substation (11/33kV) | each | $200,000 | $500,000 | $1,200,000 |
| Telecom duct (multi-way) | per linear meter | $50 | $120 | $250 |
| District cooling pipe | per linear meter | $400 | $800 | $1,500 |
| District heating pipe | per linear meter | $300 | $600 | $1,200 |
| Gas main (medium pressure) | per linear meter | $100 | $250 | $450 |
| Element | Unit | Low | Medium | High |
|---------|------|-----|--------|------|
| BRT (full standard, at-grade) | per km | $5M | $15M | $30M |
| LRT (at-grade) | per km | $20M | $40M | $80M |
| LRT (elevated) | per km | $40M | $70M | $120M |
| Metro (underground) | per km | $100M | $200M | $400M |
| Metro station (underground) | each | $50M | $150M | $400M |
| BRT station (median) | each | $200K | $500K | $1.5M |
| LRT stop (at-grade) | each | $1M | $3M | $8M |
| Bus interchange / terminal | each | $5M | $15M | $40M |
| Park-and-ride (per space) | per space | $5,000 | $15,000 | $35,000 |
| Element | Unit | Low | Medium | High |
|---------|------|-----|--------|------|
| Neighborhood park (basic) | per m2 | $40 | $80 | $150 |
| District park (developed) | per m2 | $60 | $120 | $250 |
| Urban plaza (hard landscape) | per m2 | $150 | $350 | $700 |
| Waterfront promenade | per linear meter | $3,000 | $8,000 | $20,000 |
| Playground (equipped) | each | $50,000 | $200,000 | $500,000 |
| Sports field (natural turf) | each | $200,000 | $500,000 | $1,000,000 |
| Sports field (synthetic turf) | each | $400,000 | $800,000 | $1,500,000 |
| Street tree (installed, large) | each | $500 | $1,500 | $4,000 |
| Bioswale / rain garden | per linear meter | $100 | $250 | $500 |
| Green roof (extensive) | per m2 | $80 | $150 | $250 |
| Green roof (intensive) | per m2 | $200 | $400 | $700 |
| Stormwater detention basin | per m3 storage | $50 | $150 | $400 |
| Underground detention tank | per m3 storage | $300 | $700 | $1,500 |
For quick estimates when detailed design is not yet available:
| Context | Infrastructure Cost per Dwelling |
|---------|----------------------------------|
| Greenfield (all new) | $30,000-80,000 |
| Brownfield (partial reuse) | $15,000-50,000 |
| Urban infill (existing network) | $8,000-25,000 |
| High-density urban (shared) | $5,000-15,000 |
These include roads, utilities, open space, and community infrastructure
apportioned per dwelling equivalent.
| Service | % of Construction Cost |
|---------|------------------------|
| Architecture | 4-8% |
| Structural engineering | 1-3% |
| MEP engineering | 2-4% |
| Civil / infrastructure engineering | 3-6% |
| Landscape architecture | 1-3% |
| Urban design / masterplan | 1-3% |
| Transport planning | 0.5-1.5% |
| Environmental consultant | 0.5-2% |
| Quantity surveyor / cost consultant | 1-2% |
| Project management | 3-5% |
| Planning / regulatory consultant | 0.5-1.5% |
| Sustainability / LEED consultant | 0.5-1.5% |
Total professional fees: typically 15-25% of construction cost for a
complex urban project. Simpler projects: 12-18%.
| Item | % of Total Development Cost |
|------|------------------------------|
| Legal fees | 1-3% |
| Insurance (builder's risk) | 0.5-1.5% |
| Permitting and approvals | 0.5-2% |
| Survey and geotechnical | 0.3-1% |
| Environmental assessment (EIA) | 0.5-2% |
| Marketing and sales | 2-5% (residential), 1-3% (commercial) |
| Finance costs (construction loan) | 3-8% (depends on duration and rates) |
| Developer overhead | 3-5% |
| Contingency | 5-15% (depends on project stage) |
| Stage | Recommended Contingency |
|-------|------------------------|
| Concept / masterplan (AACE Class 5) | 20-30% |
| Schematic design (AACE Class 4) | 15-25% |
| Design development (AACE Class 3) | 10-15% |
| Construction documents (AACE Class 2) | 5-10% |
| Tender / pre-construction (AACE Class 1) | 3-5% |
1. Land Acquisition
+ Stamp duty / transfer taxes (1-5%)
+ Legal and due diligence (0.5-1%)
2. Site Preparation
+ Demolition (if brownfield)
+ Remediation (if contaminated)
+ Earthworks and grading
+ Temporary works and site setup (2-5% of construction)
3. Infrastructure
+ Roads and streets
+ Utilities (water, sewer, storm, power, telecom)
+ Open space and landscaping
+ Transit infrastructure (if applicable)
4. Building Construction
+ Substructure (foundations)
+ Superstructure (frame, envelope)
+ MEP (mechanical, electrical, plumbing)
+ Finishes and fit-out
5. Soft Costs
+ Professional fees (15-25% of construction)
+ Permitting and approvals
+ Marketing and sales
+ Legal and insurance
6. Finance Costs
+ Construction loan interest
+ Arrangement fees
7. Developer Margin
+ Profit target: 15-20% on cost (residential)
+ Profit target: 15-25% on cost (commercial/speculative)
8. Contingency
+ As per project stage (Section 3.3)
For rapid order-of-magnitude estimates:
Total Development Cost (excl. land) =
Building Construction Cost
x 1.15-1.25 (infrastructure and external works, 15-25% of building cost)
x 1.18-1.25 (professional fees and soft costs)
x 1.05-1.10 (finance costs)
x 1.10-1.25 (contingency)
Simplified: Building Cost x 1.55-2.00 = Total Development Cost (excl. land)
Example:
50,000 m2 mixed-use at $2,000/m2 building cost = $100M building
Total development cost = $100M x 1.75 = $175M (excl. land)
| Product | Revenue Basis | Typical Range |
|---------|---------------|---------------|
| Residential (sale) | $/m2 NIA | $2,000-15,000+ |
| Residential (rent) | $/m2/month | $15-80+ |
| Office (rent) | $/m2/year | $150-800+ |
| Retail (rent) | $/m2/year | $200-2,000+ |
| Hotel (revenue) | $/room/night (ADR) | $80-500+ |
| Parking (sale) | $/space | $20,000-80,000 |
| Parking (rent) | $/space/month | $100-600 |
Residual Land Value Test:
Residual Land Value = Total Revenue - Total Development Cost (excl. land)
- Developer Profit
If Residual Land Value > Land Acquisition Cost → Feasible
If Residual Land Value < Land Acquisition Cost → Not feasible at this program
Profit on Cost:
Profit on Cost = (Total Revenue - Total Cost including land) / Total Cost
Target: > 15% for residential, > 20% for commercial
Yield on Cost (income-producing):
Yield on Cost = Net Operating Income (Year 1) / Total Development Cost
Target: 1-2% above prevailing cap rate
Infrastructure Ratio Check:
Infrastructure Cost / Total Development Cost
Healthy: < 15%
Watchpoint: 15-25%
Red flag: > 25% (infrastructure-heavy; consider increasing density)
When costs exceed feasibility, consider these strategies in order of impact:
| Strategy | Typical Saving | Impact on Quality |
|----------|---------------|-------------------|
| Increase density (more units sharing infrastructure) | 10-30% per unit | Positive if well-designed |
| Simplify building form (reduce facade complexity) | 5-15% | Moderate |
| Standardize floor plates and unit types | 5-10% | Low |
| Reduce underground parking (shift to above-grade) | $15,000-30,000 per space | Low-moderate |
| Phase infrastructure (build only what's needed now) | 10-20% of infrastructure | Low |
| Reduce specification level (finishes, lobby, amenities) | 5-15% | Moderate |
| Switch structural system (steel to concrete or timber) | 3-10% | Low |
| Prefabricate / modular construction | 5-20% | Low |
| Reduce building height (avoid high-rise premium) | 5-25% | Context-dependent |
| Shared parking strategy (reduce total spaces) | 10-25% of parking cost | Low |
Plan infrastructure investment to match development triggers:
| Trigger | Infrastructure Required | Typical Cost |
|---------|------------------------|--------------|
| First 200 dwellings | Primary access road, water/sewer connection, temporary open space | $5-15M |
| 500 dwellings | Primary school site, neighborhood park, local retail | $10-25M |
| 1,000 dwellings | Secondary road network, expanded utilities, community center | $15-40M |
| 2,000 dwellings | Health center, secondary school, district park | $20-50M |
| 5,000 dwellings | Full road network, transit stop, sports facilities | $40-100M |
| 10,000+ dwellings | Transit line extension, regional infrastructure | $100M+ |
| Project | Scale | Total Cost | Cost/m2 GFA | Cost/Dwelling |
|---------|-------|------------|-------------|---------------|
| Vauban, Freiburg | 38 ha, 5,500 units | ~$850M | ~$1,800 | ~$155,000 |
| HafenCity, Hamburg | 157 ha, 7,000 units | ~$14B | ~$3,500 | ~$350,000 |
| King's Cross, London | 27 ha, 2,000 units | ~$4B | ~$3,200 | ~$280,000 |
| Hammarby Sjostad | 200 ha, 11,000 units | ~$3.5B | ~$2,200 | ~$180,000 |
| Masdar City (Phase 1) | 640 ha (planned) | ~$22B | ~$4,500 | N/A |
| Eko Atlantic, Lagos | 10 km2 (planned) | ~$6B | ~$1,200 | N/A |
| Hudson Yards, NYC | 11 ha (above platform) | ~$25B | ~$6,000 | ~$2,500,000 |
| Nordhavn, Copenhagen | 200 ha (planned) | ~$5B | ~$2,800 | ~$220,000 |
Note: Costs are approximate and include varying scopes. Use for
order-of-magnitude comparison only. Adjust for year of construction and
local market conditions.
For precise cost estimation, use the Python calculator:
python scripts/cost_estimator.py \
--residential-gfa 50000 --residential-spec medium \
--office-gfa 15000 --office-spec high \
--retail-gfa 5000 --retail-spec medium \
--parking-spaces 400 --parking-type structured \
--infrastructure-roads 2000 --infrastructure-utilities 3000 \
--region gulf --contingency 0.20
See the urban-calculator skill for full calculator usage and the
scripts/cost_estimator.py file for all parameters.
This skill integrates with:
For complete construction cost tables by building type with detailed breakdowns
(substructure, superstructure, MEP, finishes):
For infrastructure cost estimation methodology including capacity sizing,
network layout optimization, and phased delivery:
For financial feasibility analysis including cash flow modeling, sensitivity
analysis, and funding mechanisms:
Take abhinavbwj/cost-estimation from the repository into ~/.claude/skills for personal
use, or into .claude/skills inside a project.
The agent identifies a skill by the name field in its header. Two skills with the
same name cannot sit side by side — one of them will be ignored.